Plate load test (As per IS 1888).

  Рет қаралды 30,442

ℚ𝕌𝔸ℂℝ𝔸𝔽𝕋

ℚ𝕌𝔸ℂℝ𝔸𝔽𝕋

Жыл бұрын

Step-1
First survey the site area and selected a suitable location for test pit as decided by Engineer or mentioned in Drawing.
Step-2
Marked the area and clean or excavat
Step-3
Filled Sand bags for Loading arrangement as required for achieve the dead loadsion as required for locate to the foundation bed level or pcc bottom level.
Step-4
Prepared the dead load structure by using sand bags, ISB (We are used 300 & 250mm), shuttering plate or any other suitable methods as required to achieve ultimat load
Step-5
###Calculation###
DEAD LOAD CALCULATION
drive.google.com/file/d/1gKOm...
LOAD CALCULATION FOR LOADING PLATFORM
drive.google.com/file/d/1oXm5...
Step-6
Place the base plate over a fine sand layer (5mm max thick) at center of the main ISM 300 (load carrying girder at center of stage) and centering by using plumb bob & spirit level.Step-7
After finish the plate installation adjustment hight are place above the plate carefully.Then hydrolic jack place properly that the load from bead transfer through jack to plate **If water come over plate or test location from ground then remove water by pumping
Step-8
Now applying the initial load and then applied 1st load, 2nd load, 3rd load .... Continue to ultimate load or failure occurred.
For each load increment settlements should be observed an interval of 1, 2.25, 4, 6.25, 9, 16, 25, 60 min.
Load increment stop If settlement rate more than 0.02 mm/min. and check settlement continue hourly.
Eatch load increment shall be kept for not less than 1 hours.
The test shall be continue till 25mm (50mm in special cases) or failure occurs.

Пікірлер: 9
@durgaprasad608
@durgaprasad608 3 ай бұрын
Best video ❤
@AshokKUMAR-rq1sq
@AshokKUMAR-rq1sq Жыл бұрын
Good job
@alkernawy
@alkernawy Жыл бұрын
please >>>could you providing password for files in describtion
@biswarupmaiti3773
@biswarupmaiti3773 Жыл бұрын
Document password?
@ankitsahay8434
@ankitsahay8434 11 ай бұрын
can you provide password to access documents please
@ashokduvvuru8144
@ashokduvvuru8144 Жыл бұрын
pdf Password sir?
@sandeepkumar-rt7hf
@sandeepkumar-rt7hf Жыл бұрын
Con company ka project hai.
@chalkerajendra9847
@chalkerajendra9847 Жыл бұрын
PSP Projects
@CarrySaifi
@CarrySaifi 2 ай бұрын
Seating pressure 0.7 t/m² nhi lagaye😂😂
Plate Load Test (BS 1377 : Part 9 : 1990) for Bearing Capacity of Soils
11:43
Proud to be a Civil Engineer
Рет қаралды 42 М.
Direct Shear Test
17:38
NCTEL
Рет қаралды 588 М.
ОСКАР vs БАДАБУМЧИК БОЙ!  УВЕЗЛИ на СКОРОЙ!
13:45
Бадабумчик
Рет қаралды 4,6 МЛН
Was ist im Eis versteckt? 🧊 Coole Winter-Gadgets von Amazon
00:37
SMOL German
Рет қаралды 36 МЛН
I wish I could change THIS fast! 🤣
00:33
America's Got Talent
Рет қаралды 126 МЛН
Geotechnical Analysis of Foundations
10:06
The Engineering Hub
Рет қаралды 712 М.
PC Girder PostTensioning 1080p 3500kbps
16:18
Khan Mahmud Amanat
Рет қаралды 158 М.
Bored Piling Explaining
23:34
PILE FOUNDATION AND RETAINING WALL
Рет қаралды 125 М.
California Bearing Ratio (CBR) Test
5:00
Sustainable Asphalt Research Group
Рет қаралды 293 М.
Shallow Foundation: Plate Load Test
15:44
Curious Civil Engineer
Рет қаралды 124 М.
In-Situ CBR Testing
6:59
Hixtra Ltd
Рет қаралды 154 М.
BASEMENT EXCAVATION - BORED PILE
16:06
qian ying
Рет қаралды 2,4 МЛН
Plate Bearing Testing
6:06
Hixtra Ltd
Рет қаралды 190 М.