Рет қаралды 177,878
The structural calculations being completed, we have placed the order for the metal joists. And in the meantime, there is a bit of preparation work before their arrival… 👇
On the one hand, the preparation of the supports on which the joists will rest.
But also make room and clear what must be to be able to route the joists through the building. And that will involve the dismantling of some floors.
All this is the result of a long reflection and calculation of the resistance of the materials, it is impossible to summarize correctly and with all the details, the entirety of this work in a few minutes of video. What is valid with us, in our situation and according to our understanding may not be valid in other circumstances.
As a reminder, this video is by no means a tutorial, but simply traces our activities, and is intended to be unpretentious.
00:00 | Hi
02:29 | Installation of a lintel
04:31 | Preparation of the support
07:50 | Seating of joists
09:14 | 1st floor dismantling
10:57 | Floor disassembly 2nd
14:02 | Wood recovery
15:00 | Another lintel
16:48 | Final preparations
⭐ FACEBOOK 👉 bit.ly/2SuRcBq ⭐ TWITTER 👉 bit.ly/2H1U1bc
⭐ TIPEEE 👉 bit.ly/2tDzJwG ⭐ PAYPALME 👉 bit.ly/2NvteVJ
💌 You can contact us via Facebook or by email (address on / lesjérômes )
#structure #beams #renovation