Solve Problem on Resource levelling to find out optimal duration to complete the project.
Please refer my following Playlists , Links are given:
1. Theory of Machines or Kinematics of Machines play list
• Theory Of Machines pla...
2. Fluid mechanics and Hydraulic machines playlist
• Fluid mechanics and hy...
3. Refrigeration and air conditioning playlist
• Refrigeration and air ...
4. Renewable Energy engineering or Non-convensional energy sources play list
• Renewable energy engin...
5. Dynamics of Machinery play list
• Dynamics of machinery ...
6. Engineering graphics or Engineering drawing play list
• Engineering Graphics P...
7. Engineering Mechanics Playlist
• Engineering Mechanics ...
8. Power plant engineering play list
• Power Plant Engineerin...
9. Engineering Thermodynamics play list
• Thermodynamics / Therm...
10. Heat and mass transfer play list
• Heat and Mass Transfer...
11. Operation research play list
• Operation Research Pla...
12. Strength of material playlist
• Strength Of Materials ...
13. Control Engineering/ Control systems engineering playlist
• Control engineering pl...