Рет қаралды 154
In this episode of switching on the San Luis Western Railway, the power for the log train will first yard the rock cars that were previously placed on the inbound track by the rock job, set the caboose over, grab the log loads, grab the caboose and depart westbound. The power for the manifest will leave the engine facility, get his train and caboose and depart eastbound. The layout will then be operated as a continuous loop.