These are my top (5) framing rough inspection checklist items. You are welcome to include your top (5) in the comments. All based on the 2018 IRC or manufacturer's installation instructions
Пікірлер: 18
@pamsimpson65484 ай бұрын
Here are the 5 things that come to mind first: 1) holes in top plate 2) not correctly sealing when joist or stud cavities are used as returns 3) headers/beams not strapped (I am in a seismic zone) 4) the sheetrock delivery people knock out studs 5) anchor bolts not tightened down Really enjoy your channel
@PPG19674 ай бұрын
Nice!!
@benstraley29876 күн бұрын
I check for the correct nails in the hangers. I can't tell you how many times I've seen short nails being used in the angle nailing in the hanger. You can literally look up into the small gap between the two pieces of lumber, and see the point of the nail....not penetrating the lumber that it's supposed to go in to.
@PPG196722 сағат бұрын
I appreciate your feedback.
@constructivainspections4 ай бұрын
"I don't know what the hell the plumber was doing here..." Baaahahahaha
@PPG19674 ай бұрын
He had a change of plans... I appreciate you watching!!
@johnathanmcclain24914 ай бұрын
Always dropping 💎!
@PPG19674 ай бұрын
Bruh, let's get together next week. I'll call you.
@Aboard_and_Abroad4 ай бұрын
boggles the mind how the super will call for an inspection with so many obvious flaws. and for the work to progess to that point means no one is on site directing the trade work either. just like a construction free-for-all... unreal. at least the beams were supported lol great job keeping the ship watertight boss!
@PPG19674 ай бұрын
It never fails... I appreciate you watching. .
@evandunkle55104 ай бұрын
Awesome!
@shawnshaffer83604 ай бұрын
It looked like the stud pack was cut and not transfering to the foundation.
@PPG19674 ай бұрын
Where??...can you give me a timestamp?
@steveA1234 ай бұрын
1:32
@PPG19673 ай бұрын
The video shows the 2nd Level.
@NewBuildingInspector4 ай бұрын
I never get lags or through bolts in deck post to beam connection. Anchor bolts always need retightened after the lumber drys. Fireblocking unused holes in top plates