Рет қаралды 12,503
The final episode of this transformer delivery series shows the transformer being self-propelled on 12 lines of Goldhofer PST/SL-E the last couple of miles to the substation. In different places along the route, the road was only a foot or two wider than the trailer with a steep ditch on either side. Also, there were several steep grades where a Cat D9 bulldozer helped us up a hill or was an additional control while going down a hill. The transformer was successfully delivered to the substation and set on its new concrete foundation.