A Look at progress of the work done at Armadale Metronet Site 5/7/24
Пікірлер: 12
@Albanach-je1nk20 күн бұрын
This is the area I asked about before, I would have described this Gosnells as I thought I would have thought that was what to call the location. So we Are having an overpass after all .
@muja2820 күн бұрын
NO THE LEVEL CROSSING IS TO STAY
@muja2820 күн бұрын
All the crossings form beckingham to Armadale will stay as they are
@Albanach-je1nk20 күн бұрын
I think that's nuts spoiling the ship for a halfpenny of tar.
@dixie26520 күн бұрын
@@Albanach-je1nk Yeah crazy, they closed the line so do all the crossings not as if they haven't got $Billions in surplus to pay for it? so when they have to do them 'which don't look like will be too long bu the amount of traffic' they will disrupt the line again? nuts!
@stefantrnacek139420 күн бұрын
That was good to see what is happening further up the line. That will be interesting to see the single crane lift. Do you know if something was wrong with the green crane? It looked like he was checking the cables.
@muja2820 күн бұрын
The Green Crane is over the other side of Armadale road For the weekend lift of the planks on the Armadale Bridge They were putting a extension on it as it was not long enough for the job .that's what they were doing with the gib on the last video
@stefantrnacek139420 күн бұрын
@muja28 thank you.
@jasonswift70989 күн бұрын
What is happening at the William st railroad in beckenham?
@muja289 күн бұрын
A new station is being built. Have a look at he Metronet website
@jasonswift70989 күн бұрын
@@muja28 Have you seen any or taken any photos in that area or just Armadale?
@jasonswift70988 күн бұрын
@@muja28 Does not say anything about it! there is no update photos for July 2024.