Рет қаралды 48,593
This is part 1 of our trip to Cape York in Sept 2015
CREB Track - Cairns Regional Electricity Board, basically a track for power line inspections.
We were warned not to attempt in the wet, they were right.
hardest days 4wheelin i have ever done!
The forecast was for clear weather and the track was open (closed when wet!) when we arrived, even though there was a light drizzle.
Watch to the end to see the damage done
Amarok has a 35mm front lift with Dobinson Springs, rear 25mm lift, Bilstein B6 Shocks, 16inch Alloys with Bridgestone D674 MT's