Рет қаралды 362,650
Radiant Floor Heating in my Shop. What parts I used and How & Why I used them. This can be an expensive project, but it doesn’t have to be and it doesn’t have to be overly complicated! Here is my system and I will try to explain why I did what I did.
Parts List:
Supply House # Description Amazon Equivalent *
3x 519602 1" GF 15/26 Cast Iron Pump Flange Pair (NPT) amzn.to/3svjwte
1x HC11-A 11" HydroClaw Expansion Tank Support Bracket amzn.to/3qnTMMr
4x BRB100-075 1" x 3/4" MIP x FIP Brass Bushing amzn.to/3soUonU
2x BRB100-050 1" x 1/2" MIP x FIP Brass Bushing amzn.to/32qGhU6
4x BVT100-NP 1" Full Port Threaded Ball Valve amzn.to/32xxjUX
4x BRT100 1" FIP Brass Tee amzn.to/3mtXrap
10x BRN100-400 1" x 4" Brass Nipple amzn.to/3qfv54W
1x B4F30 30" Stainless Steel Hose (1/2" x 1/2" FIP) amzn.to/32e27dX
1x 40532W 1/2" MIP x FIP Full Port Brass Ball Valve amzn.to/32ezw8k
5x 22223-0000LF 1" SharkBite Ball Valve amzn.to/3sqQsDb
1x U715 1" Sharkbite Disconnect Tongs amzn.to/3sCrmB4
1x VJR100 1" Spirovent Jr. Air Eliminator (Threaded) amzn.to/3msIndm
1x U714 1" Sharkbite Disconnect Clip amzn.to/3FpRTW4
1x U702 1/4" to 1" Sharkbite Deburr & Gauge Tool amzn.to/32jvgnK
2x U464LF 1" Sharkbite x 1" Sharkbite x 1" FNPT Tee amzn.to/33UL8Ob
1x D-502F Digital Hydronic Radiant Floor Thermostat amzn.to/3msL5zv
1x SP-83 3 Zone Pump Controller Switching Relay amzn.to/32xFRuY
8x U140LF 1" Sharkbite x Male Adapter amzn.to/3Jg84Y6 2x U142LF 1" Sharkbite x 3/4" Male Reducing Adapter amzn.to/3FopmjN
7x U260LF 1" x 1" SharkBite 90° Elbow amzn.to/3stcVPS
6x U374LF 1" x 1" x 1" Sharkbite Tee amzn.to/3FoIXjL
6x U020LF 1" x 1" SharkBite Coupling amzn.to/3qopYj1
2x 0121663 LFDPTG-1 3" Pressure & Temp. Gauge (0-50 psi) amzn.to/32jz1tv
3x 107-169 T-540 3/4" Brass Water Heater Drain Ball Valve amzn.to/3ppdDvq
1x 930-612001 1/2" MIP x 1/2" MIP Barstock Hex Brass Nipple amzn.to/3suYHhi
3x 52722512 UPS26-99FC, 3-Speed Pump, 1/6 HP, 115 volt amzn.to/3z1LDl2
1 - 7 Loop Manifold Radiant Floor Manifold 1/2" PEX Tubing amzn.to/3HcahlR
1- 4 Loop Manifold Radiant Floor Manifold 1/2" PEX Tubing amzn.to/3yT7Hy0
The Amazon links represent items closest to what I used in my system if not the same part number.
Thanks for watching!!
Please Subscribe!
Please checkout my Amazon List (Store) to find all the Tools and Parts I use in the shop!
These Amazon items help support the channel and add no extra cost to you. Thanks for Shopping.
As an Amazon Associate I earn from qualifying purchases.
www.amazon.com...
HELPFUL WEBSITES:
www.radiantec.com
product-select...
forum.heatingh...
home.howstuffw...
Get all the up to date info on Facebook. / allisoncustoms
AllisonCustoms.com
Questions@AllisonCustoms.com
Intro Music By:
Thor's Hammer - Ethan Meixsell
#AllisonCustoms #radiant #heatmyshop