He's getting the bug. This run is to get a feel for the job and to get the bugs worked out :-)
@rbarricklow2 ай бұрын
It has to be really hard on the equipment
@--_DJ_--2 ай бұрын
@@rbarricklow Definitely a lot harder on them than digging muck out of a pond.
@crandonborth2 ай бұрын
@@rbarricklowExactly see his bucket teeth on the 220 they are almost shot... when he started here they weren't nearly that worn out.
@jomo2792 ай бұрын
i have to be honest - this concrete crushing thing has really become boring compared to Chris' other work
@davidsprigg26692 ай бұрын
I think your calm demeanor in the face of problems may be as impressive as your work ethic. You’re amazing… 👏👏
@rickallen93822 ай бұрын
The rental company sent you their maintenance problems . When it's time to pay the bill, adjustment is in order. Make them pay for your down time.
@johnrobichaud1302 ай бұрын
ABSOLUTELY
@mke7232 ай бұрын
Its hard for the rental company to be blamed for the lack of maintenance done by a previous renter. Too many people dont grease their OWN equipment, much less a rental. And things wear out with use. Called wear items.. They crushed ALOT of concrete.
@stephenw29922 ай бұрын
@@mke723 The rental company should make sure its fit for purpose, including after the last renter didnt look after it. Its not for the next customer to fix the last guys abuse. If the rubber parts were all in place the belt likely would have lasted longer too. They should be paying Chris for using their junk at this point.
@guggler2 ай бұрын
@@stephenw2992unfortunately most places Gove it the once over and back put the door it goes onto thext victim
@theoriginalbuggins2 ай бұрын
Came here to say this. It's half-assed for the rental company not to maintain equipment like this between jobs. If a customer is negligent, then it's on the customer. If it's wear and tear when being used as intended, then it's on the rental company.
@FSEAirboss2 ай бұрын
That one shot shows why all the fines seem to go to one side. The wind separates it as it falls out of the conveyor.
@CK-yi6pc2 ай бұрын
That crusher will damn sure be returned in much better condition than when you got it….. 🇺🇸🇨🇱
@mikeembrey91762 ай бұрын
Surprised the crusher holds up as well as it does its job 👍🏻🇺🇲
@archstanton92062 ай бұрын
That is one complex machine, and it takes a bit of a beating just doing what it does, so yeah problems are to be expected...but a lot of the problems you have had are directly related to how the machine has been maintained...long before you got it. I know the frustration you must feel. It sucks.
@kirk4672 ай бұрын
That’s crazy how that crusher separates all that rebar and debris! 👌🏻
@rons47782 ай бұрын
The transformation of this part of the site is remarkable and when the going gets tough some keep going and others are gone
@dontneedthishandle2 ай бұрын
It's a beautiful thing, watching two well maintained excavators working side by side with rhythm!.
@Gotblade2 ай бұрын
You've done a man's job sir! Maintaining a good attitude while having problems is crushing it!👏
@Vickie-Bligh2 ай бұрын
Bummer on the belt. Thank you Zach for the great video shots from the top of the pile. Robert as usual doing such a fine job. I am amazed at how quickly you ran through that huge pile of concrete, Chris. I'm sure you will be happy when this is finished. But I appreciate you bringing us all along with you. Thanks for that.
@ZachsTreeService2 ай бұрын
your welcome. I got pretty much all the shots in this video. When the machine is running Chris and Robert dont have the time to get good videos. Its pretty much all hands on deck then.
@Vickie-Bligh2 ай бұрын
@@ZachsTreeService Zach, it is very much appreciated. 🤗
@rustysteel87142 ай бұрын
@@ZachsTreeService 👍👏🍻
@arkansas13362 ай бұрын
I had a small plant with 3 50' radial stackers (made 3 different size products at the same time). I always enjoyed watching the 'pebbles rain' off the end of the stackers...and I throughly enjoyed watching this operation! Thanks for the video!!!
@dale58982 ай бұрын
Note to self! Never purchase a second hand crusher.
@GARDENER422 ай бұрын
I reckon if it'd been owned by Chris it would be a safe buy - everything he owns is kept in top condition, greased & serviced.
@guggler2 ай бұрын
2nd this. Spent 2 weeks working bugs out of a used one that the company I work for bought. Went back to the dealer and to this day still doesn't work over half a day before some sort of issue
@--_DJ_--2 ай бұрын
@@guggler Reminds me of a track mounted drill rig the boss brought up from Ohio. First thing I asked when it landed in my shop was "what is the return policy?" They were CAT (D3?) dozer tracks on a custom base, both looked like they had been ripped off at some point and bubble gum welded back on with no care at all for alignment. I am pretty sure it rolled down a hill or something. They sunk at least a quarter million into it in just repairs over 2 years, still junk. Just holds the asphalt down in the corner of the yard now. I warned them, they ignored me. The guy who sold it to us must still have a big old grin on his face.
@axcs01192 ай бұрын
Having both machines working does make for a smoother operation
@alanlewis65002 ай бұрын
You are the best. Hope the customer is paying you a helluva lot for this hellacious job!!
@scottburk40832 ай бұрын
It is what it is! If it was easy everybody would be doing it. Have a good one Chris,take care and God Bless!!!❤😊
@brucehuff55662 ай бұрын
They fix belts on gold rush in one episode haha. That sucks thanks for the videos. Stay safe
@garydillon39602 ай бұрын
So sorry for the breakdown. Better days ahead. God Bless.
@terryrogers10252 ай бұрын
The only time machines break down is when you’re using them and then it’s usually right in the middle of a really good run. Crushers and conveyors take a pounding and quite possibly you got hold of a machine that had not had good maintenance pulled on it. Tough break, stay the course, you’ll come out a winner, thanks for the update, enjoy the videos.
@dennisthecarver2 ай бұрын
Like Roseanne Roseannadanna would say "it just goes to show you, it's always something - if it ain't one thing, it's another."
@ipaddlemyowncanoe.74412 ай бұрын
Yep, when it rains it pours doesn't it? Yeah it's not good for the belt but that's part of the job. 👍👍🙂🇨🇦
@dale58982 ай бұрын
No wonder the other contractor walked away from that job.
@jrand26312 ай бұрын
Yeah, but when you accept a contract you're supposed to fulfill it - walking away looks bad and gives your company a bad reputation.
@daithi0072 ай бұрын
But they haven't been named, so that's not really true.
@jerrymclean80752 ай бұрын
Chris isn't one that would shame people! Just leave it alone and let Chris prosper from thos crazy job!!
@bruces26652 ай бұрын
@@jrand2631 maybe they saw they were over their head.
@Skorpychan2 ай бұрын
I think the big chunks of dirty concrete mixed with the pig slats are why. The issues with this crusher are just due to it being a rental machine.
@gregblanton93862 ай бұрын
Lots of maintenance. That's the Crush Life!
@texasproud33322 ай бұрын
As business owner you live and learn as a former contractor you eventually determine which stuff makes money and what don’t
@dougmay89242 ай бұрын
Rockin&Rollin,&Crushin,,!!! No matter what you do,,You are the MAN ,,!!! LET'S DIG 18,,!!! THANKS AGAIN FOR ALL YOU DO FOR US PATRIOTS ❤, YOU ARE BLESSED! ❤️
@ryanhoward10132 ай бұрын
And we are blessed to have Chris for education and entertainment.🙂
@evilgibson2 ай бұрын
Cringey Commenter Andy 🤢🤮🤮🤮🤮
@billweinschenker86072 ай бұрын
Let’s get ready to “CRUMBLE”!!!!
@cullenmiller81702 ай бұрын
I hope you got the rental insurance. 🤣🤣 Anything that runs conveyor belts is only an eye blink away from ruining your day. That’s going to take a lot of zip ties and duct tape.
@juanalvear8602 ай бұрын
I used to wonder why so many operators had back problems, but after watching Chris rag-doll around in the cab, I think I understand.
@dansbrown13132 ай бұрын
Hello Chris, it's a wonderful thing to see people like Robert and Zach show up to help you with your projects. Robert does whatever you ask him to do and he's a machinist. Would be fun to see a video of you helping Robert at the machine shop.
@jrand26312 ай бұрын
That sucks. In my own experience rental equipment only get the most basic maintenance from the rental company, because so many different people operates them, and they do not always treat the equipment nice, so it'll be worn out prematurely, no matter the quality of the maintenance.
@Lothaenorixius2 ай бұрын
An hour of maintenance is preferable to days of breakdowns in my book
@robmatthews79722 ай бұрын
Every job, every project always has some problem to work out to keep production going. You have worked to finish what others started and gave up on after the 'easy work' was done. Your and Robert`s work ethic is commendable. I remember when concrete was $50 per yard out of the truck,,,used and broken waste was for bulkhead fill of shoreline. Now that its pushing $300 per yard, used concrete is a valuable commodity.
@sharonmiller64362 ай бұрын
I've got you on that - I remember when concrete was $15 per yard. 🙂
@audiebodine5192 ай бұрын
You are right about that if you aren't having breakdowns you are definitely not crushing.
@garymessina16092 ай бұрын
Now we can see why nobody comes back to finish a crushing concrete job great video thanks Chris and Robert and maybe Charlie
@BrianMoro-gz8de2 ай бұрын
I don't miss working a crushing crew at all!!!!
@kenlee55092 ай бұрын
6:07 a really good view of why the fines wind up on the far side of the pile.
@charlesswhitlock2 ай бұрын
At least you have the fuel trailer to help reduce the maintenance time. Imagine doing fuel with your old buddy tank and a grease gun lol.
@user-rt8ik1ow4i2 ай бұрын
The phenomena of the finished products being separated like the bigger stuff than the finer stuff in the pile.It's because the wind is blowing the finer stuff 21 side and the heavier stuff says to the other side
@2xKTfc2 ай бұрын
A pile separates even on a day with zero wind. Then the coarse chunks roll down the side further than the powder does, so your pile ends up with the big chunks near the bottom and the finer stuff near the top center. Not a good thing either, the customers usually need an equal mix.
@user-rt8ik1ow4i2 ай бұрын
@@2xKTfc No you couldn't set it a little bit You're trying to say I'm wrong and I'm not wrong. We're both correct, but I am more correct. Because that would be easily fixed by keeping the end of the conveyor 3 inches from the pile. Then you would be wrong all the time and I would be right. So who's more right Mr.Know it all
@2xKTfc2 ай бұрын
@@user-rt8ik1ow4i You're not wrong, of course wind causes sorting like you say. Heavy stuff accumulating near the bottom can't be prevented by running the conveyor low over the pile, that's still gonna happen. I'm sure you can imagine both of these means of sorting occuring at the same time.
@bosshogg35482 ай бұрын
Job well done 👍🏻 5:46 love how your friend gets in the camera frame 😂
@themorganator2 ай бұрын
Such a great project. I've really enjoyed following along!
@mrtowmonster2 ай бұрын
That's a self destructive device it's like a redheaded step child you got to constantly got to do something to it
@joejohnson70972 ай бұрын
If didn't have a problem during the job It wouldn't be a job. Thanks for the video
@IR-nq4qv2 ай бұрын
A crushing defeat to an otherwise stellar week. Out of all of the jobs you've taken on, this one seems to be the most labor intensive. A guy needs eyes in twenty places at once, definitely no small undertaking. This stuff will happen, better days ahead, awesome job so far with 2-1/2 massive piles. At least you have material to use on the road until you get a belt.
@cathiwim2 ай бұрын
Anybody else hear the killdeers squawking, while they are working?
@imchris50002 ай бұрын
yeah its tough to keep a crushing operation going solo you just about need a full time mechanic part time operator just minding the crusher and the belts
@williammatthews29482 ай бұрын
Hang in there Chris, it'll get better soon.
@TomTalley2 ай бұрын
"Rocking an rolling now!" Good one, Chris.
@dankolar60662 ай бұрын
Can almost smell and taste the concrete dust. Nicely done. Thank you for sharing. Wish you well.
@Curtislow22 ай бұрын
OH I CAN!lol!
@ZachsTreeService2 ай бұрын
I could smell and taste it getting those video shots haha.
@weirdmood81022 ай бұрын
Just commenting for the algorithms. You'll have that on them big jobs!
@guggler2 ай бұрын
I'm glad I wasn't the only person to have issues running an impact crusher. They work great when they work. But that's really not to often
@tomrogers94672 ай бұрын
Seems like a lot more machinery than a cone crusher and a screening plant would have.
@guggler2 ай бұрын
@@tomrogers9467 they are nice cause you can continuously move the whole setup from the excavator cab. Example would be on a highway project they can crush the old concrete road and pile it up as base next to the old road bed and save on trucking. The one I used has a wireless remote you could track everything and run it all from the cab of the excavator. Unless you were out working on it 🤣
@bobgallahan96632 ай бұрын
I don't read all the comments but I think I figured out for myself why the tailings could be one side of the pile, the wind blows the tailings to the side as it comes of the conveyor. Man I just knew Chris was going to say "LET'S GET READY TO CRUMBLE!!!" . LOL
@williamuskoski13852 ай бұрын
It does that even with no wind. Any thing that comes off a belt does it. The bigger pieces roll down the pile
@mshilko2 ай бұрын
Ready to see some roads built or some ponds.
@randywilson68692 ай бұрын
That’s what I call crusher run
@davidcarberry35472 ай бұрын
nice to have a variety even if you wouldn't want to do it all the time
@genesiedenburg97982 ай бұрын
Great video, love the diffrent shots that show your progress. 🇺🇲👍
@roseannvolrath22712 ай бұрын
Good morning Robert❤
@priestley7492 ай бұрын
Happy Easter to you and your family, God bless.
@paulhavens47422 ай бұрын
this clearly shows why "fines" fall on one side and the coarser stones fall on the other. plain as day
@user-dn6ij6lm2g2 ай бұрын
Thanks for the video on crocher .
@charlessmyth2 ай бұрын
[5:58] The Third Man [10:22] The 220 keeps up with the crusher well enough :-) [19:51] That belt will cost a few dollars to replace. [19:40] Would be a good idea to get the other pieces of rubber, before relocating to the next section, so as to get more stuff crushed and crush the problems :-)
@BillW-NJ2 ай бұрын
I really liked the time lapse video and all the different angles, very nice while it lasted.
@Todd.Roberts2 ай бұрын
With all that material you can make a lot of roads . That was a nice size pile of rebar to.
@donnajkelleyphotography2 ай бұрын
Miss seeing you out there working Todd!
@Todd.Roberts2 ай бұрын
@@donnajkelleyphotography yeah I miss being out there to .
@ryanhoward10132 ай бұрын
@Todd.Roberts. Hi Todd, you'll be back out there your a good operator.
@Todd.Roberts2 ай бұрын
@@ryanhoward1013 well let’s hope so . I miss it .
@robertschoeppner59032 ай бұрын
Last night I watch the video from three years ago...you and Charlie crushed concrete for a lumber yard parking lot....you cone along way....thanks for the videos...
@ryanhoward10132 ай бұрын
3 years ago he was doing all the loam also
@davidkettell10732 ай бұрын
Belts wear out pretty fast on a machine like that,just a matter of when.
@ronpeacock99392 ай бұрын
Well, that certainly would shut you down hard. fun to watch you work with this machine… loved it a few years ago when you used it before and still enjoy.. too bad you’ll be down for a few days I’m sure…
@nigelhales8742 ай бұрын
I was operating a power screener few years back we putting out different grades of stone and I was running a loading shovel to pile materials up in between loading with excavator 👍 watching again Chris
@EdD-ym6le2 ай бұрын
Bummer , that thing is pretty bad azz when its working ... 1000 tons a day is a lot of material .
@GoBlue792 ай бұрын
With Zach - who needs a drone!
@ZachsTreeService2 ай бұрын
Would of been alot eaiser on my legs climbing up the pile if I had used the drone haha.
@alfadoofus2 ай бұрын
The place looks a lot better . I'm glad you had a crew there , nice extra footage from the job site wanderer 🤣
@ZachsTreeService2 ай бұрын
I had some free time and wanted to check it out haha. Cant just stand around and do nothing either so figured i would get some good video.
@alfadoofus2 ай бұрын
@@ZachsTreeService You did a good job on filming , I guess that would be a back-up plan if your tree service gets slow😆
@ZachsTreeService2 ай бұрын
@alfadoofus Thanks man and I keep more to do then I can shake a stick at fortunely.
@alfadoofus2 ай бұрын
@@ZachsTreeService more is better than less 👍
@trebornesregrot2 ай бұрын
I don't remember meeting Robert. He is around a lot he is amenable to the idea, an introduction for those of us who are incurable curious would be nice! Maybe the other cast members of your menagerie too!
@johnz96232 ай бұрын
In one of your previous crushing videos you commented about the fines being separated on the pile. Look at around 8:00 - it looks like the wind may play a part in where the fines end up in the pile.
@swagtech_2 ай бұрын
Remarkable craftsmanship displayed by these industrial giants.
@johnb.29362 ай бұрын
The different camera views made it more interesting to watch. 👍
@rascal223312 ай бұрын
Wish you could see the rocks actually getting pulverized in the machine
@maxmacdonald71742 ай бұрын
What a bummer that a crushing way to end the week.
@mickbaker24832 ай бұрын
Any kind of work when you have a conveyer you will get problems and if the servicing is not up to a good standard then crap will happen it's a sham your getting it through Chris, crusher pads and a water leek and now the belt saying bye bye, I just hope the rental company are on the ball and get you a new belt and the rubber guards so you can get back to crushing asap because you still have the concrete bases to crush up that other road, I wish you good luck with the rental company and they get you back working quickly thank's for your great videos they bring back many memories of when I was on site work from shovelling muck by hand to operating excavators and even repairing them.
@albertbusscher42702 ай бұрын
Chris, you were going so well and getting towards the end of crushing !! It's not your fault that the belt broke, it may have had a weak section and needs to be repaired or replaced. Stick with it and the outcome will be fantastic to you and the owner of the property. Greetings from Australia
@davidgenthnerjr49952 ай бұрын
You'll have that on them big jobs, lol. I am enjoying the crushing job. I missed the video where you explain what all this road base is for.
@BuckMasterNorm2 ай бұрын
Good luck Thanks
@erikcourtney18342 ай бұрын
Chris said I’ve had enough and started feeding it full tilt with the 220 lol. Digging big stones gets old really fast
@jaquigreenlees2 ай бұрын
mbmm has a turnkey system for processing ores to get precious metals from, they have vids of the system on their yt channel. the vids show how much difference proper maintenance being done makes. while their gear is smaller, crushing hard rock ores is just as hard on the gear and they put the effort in to keep it running right, even to make the maintenance easy to do. the system is a jaw crusher, a conveyer into a hammer mill into a shaker-table into 4 outputs, the 4th being the tailings that drop into a screw conveyer that lifts out the tailings and separates them from the water the hammer mill and shaker-table use. the water is sent into a setting tank and is reused by the system. the first 2 outputs are the pay dirt the 3rd might have some ores but usually not. small gear for smaller tasks but it gets pounded as hard by the tasks.
@jaquigreenlees2 ай бұрын
www.youtube.com/@mbmmllc the yt channel, you can find the vid Jason shows the turnkey system and explains the maintenance and servicing before showing use of it to process some ore. ( yt doesn't like me posting links even to yt vids )
@jaquigreenlees2 ай бұрын
just testing to see if they will let me link to a yt hosted hour long vid. kzfaq.info/get/bejne/Z8mUdbGL1crDe6M.html he even processes 1 ton ore sample and smelts it down in it.
@TheHillbillyEngineer2 ай бұрын
Losing a belt brings back some tramatic memories for me.....I had just gotten over the pointing and laughing and now this! :)
@williamledoux92512 ай бұрын
Chris, with your luck now, I feel like jumping in the crusher myself!
@keithdunlap27012 ай бұрын
Oh Man !! Ain't that some BS !! Can't win for losing, seems like it's always something with a damn rental machine !! Seems like such a Big complex machine like that, that they would go over the whole machine before letting it go out the door again before everything was went over !! Dammit Man, hate that for ya Chris, that's costing you money every time that machine stops before your done. Well, It was a great video and it was going pretty damn good it looked like Man, always something !! jsmh... Well hell ,try again soon as ya get the dang belt !! lololol... Great as always Chris, Have a Great Evening , And, On too the Next !!
@jimforsyth2.2 ай бұрын
Need to add a electric magnet bucket
@amos44572 ай бұрын
I bet the bucket teeth on the 220 will need to be replaced after this job just watching him dig the excavator is taking a beating. Man that concrete is so abrasive an heavy.
@dianelabelle69392 ай бұрын
As the material falls off the conveyor, the bigger pieces fall straight down, and the fines are blown off to one side of the pile. Great job. Do you get paid for the repairs you do to the rental equipment?
@tomrogers94672 ай бұрын
I expect he’s have the insurance coverage on it. It’s mandatory where I rent, I pay 10% of the damage, insurance pays 90.
@donnamullins20892 ай бұрын
Broken belt. A rental you have to maintain and repair. Bummer.
@robertbohannan22552 ай бұрын
Anybody can do the easy jobs. Cudoes to Chris and Robert for doing such a tough job that needed doing. Not being a contractor myself I don’t know how u would bid a job like this if not on a cost plus basis. Great job anyway
@johnholl77172 ай бұрын
Chris I definitely feel like you are doing your part a the renter as far as respecting the equipment, but this rental company has sent you a piece of junk that has not been maintained or checked our at all between renters. They should definitely knock some money off the rental fees.
@meyer6292 ай бұрын
Heya Chris. Wow. What an ordeal this has been for you. I guess looking back on it after you're done will give you alot of reasons for never ever doing this again! I'm certainly no expert in this, but it seems to me alot of the problems have been with the inferior and poor maintenance and service on a piece of equipment like this. The very last thing you said was the circ belt had a tear in it?? Wtf!! How does a rental company send out a piece of equipment like this without a thorough going over?? At the very least, they should give you a huge credit or reimburse you for lost time etc having to deal with their carelessness. Word will get around within the industry and that company should cease to exist. Hang in there. And sincere thanks for all you do that is honourable, honest and appreciated.
@twodogsandtheirfamily2 ай бұрын
Thanks for the timelapse, looks impressive!
@donmiller3582 ай бұрын
Chris, this has been a beast of a job, but I'm confident to say, you wouldn't have taken it if it wasn't going to pay off handsomely..$$$$ Peace, nicely done.
@jcullipher012 ай бұрын
That concrete has to be hard on your equipment.
@jace16982 ай бұрын
Why would it be hard on equipment , it’s just loading lose material into a hopper . The crusher does the hard work 🙄
@yowser87802 ай бұрын
@@jace1698 Eh ? No, he broke the concrete up using a wrecking ball. Just handling rock is hard on equipment. Stress on pins, stressed metal, worn buckets etc etc. Some guys make a good living on handling rock. Either you turn over the equipment soon (auction)... or have they big maintenance shops.
@Car-dash-Ian2 ай бұрын
I think anyone who runs or has run any heavy equipment has to be calm or become calm. Whether it's a combine harvester a forage harvester or even trucks you can get into some serious problems at least with rock crushing you don't have the pressure of weather and customer complaints. I think powerscreen Terex Finlay have revolutionized crushing and screening 30 years ago only static plants existed so everything would have to be hauled there or you would just have to bury it on site. I remember one such operation and when some breakdown would happen the 2 way radio would get busy and all available men would be called to help and service vans would arrive on site and work through the night and the weekend to get the plants back up and running. So breakdowns don't really phase us we just get involved and the buzz and adrenaline keeps you going plus you get the appreciation from the operator as someone who they can count on in crisis. Love watching the videos it's like a bus man's holiday to me.
@rodneywroten29942 ай бұрын
what that machine goes through I am surprises that it not breaking down all day ,,,tough machine
@95thousandroses2 ай бұрын
on the WelderFabber channel he is always preaching that the crushers he works on need to have a dedicated person sent with them to oversee-operate when renting them out. To many things to maintain and go wrong to have JoeBlow rent out the machine and neglect it.
@chadstreit85312 ай бұрын
I have to wonder how badly this project wore down the teeth on the buckets. All that concrete had to be murder on them!
@doritleis27732 ай бұрын
It is very annoying, if on the last Worktime the Convetor Belt to tear! The Time Planing for this Work not to observance is. Then a new Convetor Belt new to instsll to take a long Time. Thank for this good Video. 💪👌👍🥵