How to read a grade rod in decimal feet/How to set your grade rod from a hub and check grade.

  Рет қаралды 49,386

Building a earth moving company

Building a earth moving company

Күн бұрын

In this video we will break down how to read any grade rod in decimal feet. We will also show you what feet,tenths and hundredths look like on a lath and set your grade rod from a hub with a cut or fill and check grade.

Пікірлер: 49
@pjp80s
@pjp80s 2 жыл бұрын
I have to tell you guys… there a tons of videos here attempting to explain this process and yours by far is the easiest to follow.
@Buildingaearthmovingcompany
@Buildingaearthmovingcompany 2 жыл бұрын
Thank you. We really tried to break it down as simple as possible. And thanks for watching!
@Mr1laker
@Mr1laker 5 ай бұрын
I agree, perfect explanation good stuff !
@michaelpopescu6615
@michaelpopescu6615 Жыл бұрын
Finally. Someone who explained it easily
@seeunow44
@seeunow44 6 ай бұрын
By far the best explanation!!!!!!!! Must be former military!!
@Buildingaearthmovingcompany
@Buildingaearthmovingcompany 6 ай бұрын
We wish we were! Might of led to better choices and no prison time! Thank you for watching!
@caseyarmstrong343
@caseyarmstrong343 Жыл бұрын
You guys make it super easy to understand.
@charlieperez6844
@charlieperez6844 6 ай бұрын
Best explanation on utube! Thank you so much for posting! Already pushed the Follow tab
@Buildingaearthmovingcompany
@Buildingaearthmovingcompany 6 ай бұрын
Thank you for the support!
@user-rf7kq8tz6o
@user-rf7kq8tz6o 5 ай бұрын
Wowsers. I understand it now. It just clicked in my head. Cheers boys use helped me out heaps 🤙🏻
@Buildingaearthmovingcompany
@Buildingaearthmovingcompany 5 ай бұрын
you got it!
@jc-ul8ip
@jc-ul8ip Жыл бұрын
Thank you for making it simple
@user-xd7zk1pw5y
@user-xd7zk1pw5y 3 ай бұрын
You mean normal units, and then the ammerican way. I love how you guys use tenths. Just go metric and there will be at least time enough saved at the end of the day for at least 2 more beers
@famfam6205
@famfam6205 2 жыл бұрын
Great thank you for this video keep them coming
@Buildingaearthmovingcompany
@Buildingaearthmovingcompany 2 жыл бұрын
Thanks for watching buddy! We will be doing many more grade videos
@famfam6205
@famfam6205 2 жыл бұрын
Can you make a video on how to make a banjo
@russellthomas9249
@russellthomas9249 Жыл бұрын
@@famfam6205 banjos are great for curb grade , footings , shallow pipe grade,etc. you need a 5 , 6 , foot rod , 1 foot rod measured from the top of long rod at 90 degrees on the end,. a 4,5,6 inch bubble . level taped on top of your long rod these clowns can't help you. let me know if you need to know how to read it .
@tedjohnston8972
@tedjohnston8972 Жыл бұрын
Thanks! Very helpful.
@Buildingaearthmovingcompany
@Buildingaearthmovingcompany Жыл бұрын
you got t!
@spykids6087
@spykids6087 Жыл бұрын
Great video. Thank you I am building a road 750’ with a slope of 10%, can you please give me an idea how to set up my laser to get a straight slope. Thank you
@chinchuling0710
@chinchuling0710 Жыл бұрын
Thanks construction knahledge
@charlesviner1565
@charlesviner1565 Жыл бұрын
👍just subscribed
@mikecioka1180
@mikecioka1180 3 жыл бұрын
Easy yo understand
@Buildingaearthmovingcompany
@Buildingaearthmovingcompany 2 жыл бұрын
Thank you for watching!
@SyntheticGrassLaunch
@SyntheticGrassLaunch 8 ай бұрын
Awesome.
@Buildingaearthmovingcompany
@Buildingaearthmovingcompany 8 ай бұрын
Thank you.
@dylanchandler3697
@dylanchandler3697 Жыл бұрын
So could you use this technique on digging out foundations? Based off print and grade?
@UnlockingSecretsofTheUniverse
@UnlockingSecretsofTheUniverse Жыл бұрын
Yes you can. Shoot a set point, get the number off your grade rod and add the thickness of your footing. Your prints will give you top of footing elevation.
@jrgd9083
@jrgd9083 2 жыл бұрын
Man everything sounds so confusing but ill get it soon! So if the 1 foot mark on the lathe says “f” to fill. Does the machine operator throw dirt to fill up to that 1 foot?
@erock5010
@erock5010 2 жыл бұрын
Yes
@wdwtx2.0
@wdwtx2.0 Жыл бұрын
Booyah!
@patwatson2454
@patwatson2454 2 жыл бұрын
Is that a FF grade?? If so you need to add the material you are using to the grade for subgrade,the way I do Here in Florida is say your stake says grade,that's finish product, Well on a grade I measure up a ft make it a C-1 cut one so I would be 12" from finish grade,Then you have to add your material thickness we usually put 8" of lime rock down so when I'm cutting subgrade and stringing it I would need to read 21 & 1/2 inches for my sub grade 8" of rock 1 & 1/2"of asphalt
@Buildingaearthmovingcompany
@Buildingaearthmovingcompany 2 жыл бұрын
So what we did here is try to make it as basic as possible which is why we left finish and sub grade out. We felt this was the first step into understanding writing on lath then get into actual story steaks. thank you for your input! What your saying is correct you definitely need to take into account the thickness of your material for grade when reading lath. We will be making another grade video here shortly.
@patwatson2454
@patwatson2454 2 жыл бұрын
@@Buildingaearthmovingcompany 10-4 glad someone is trying teach people I normally hire guys that say they know how then have to do it myself because they freeze up
@bulletquest
@bulletquest 3 жыл бұрын
Fill is subtract, cut is add
@smokingbluedream
@smokingbluedream 2 жыл бұрын
Anything high or low of your number is a cut or fill
@patwatson2454
@patwatson2454 2 жыл бұрын
If it's below your target number it's high above it low
@katdeskinner
@katdeskinner 3 ай бұрын
White ribbon is a 1’ hikeup to grade. Yellow is 2’.. red id 3’ blue is grade. Dont use white for top of curb. Should be blue at grade on stake. Peace.
@Buildingaearthmovingcompany
@Buildingaearthmovingcompany 2 ай бұрын
Color can vary based on where in the country you are, thank you for the input.
@dblood8529
@dblood8529 2 жыл бұрын
Why do you use tenths and hundreds in grading?
@Buildingaearthmovingcompany
@Buildingaearthmovingcompany 2 жыл бұрын
It is easier to add and subtract decimal feet than inches or fractions of a foot. It also saves you from converting from inches to tenths when pulling elevations off a lath for example.
@kikovert
@kikovert 11 ай бұрын
So f I fill and c is down ?
@Buildingaearthmovingcompany
@Buildingaearthmovingcompany 10 ай бұрын
Yes, up from your hub for fill and down from your hub for cut.
@grumpy1962R
@grumpy1962R 11 күн бұрын
When I put a tape measure to my grades stick the inches don’t line up. This isn’t even a matter of tenths of an inch or decimal or fraction, the distance between 1 inch and 2 inch compared to my tape measure is not 1 inch.
@smokingbluedream
@smokingbluedream 2 жыл бұрын
6 ft ruler only a grade rod for eye levels lol
@UnlockingSecretsofTheUniverse
@UnlockingSecretsofTheUniverse 2 жыл бұрын
It’s all we had on us that day. It works exactly the same, just shorter. It is fast and easy to use one of these grading a pad with a receiver.
HOW TO READ A DIRECT READINGCUT FILL ROD
9:58
TigerSupplies
Рет қаралды 77 М.
YouTube's Biggest Mistake..
00:34
Stokes Twins
Рет қаралды 74 МЛН
Don’t take steroids ! 🙏🙏
00:16
Tibo InShape
Рет қаралды 42 МЛН
маленький брат прыгает в бассейн
00:15
GL Show Russian
Рет қаралды 4,4 МЛН
Surveying: How to Read and Write Survey Stakes
4:43
LeanSurvey
Рет қаралды 12 М.
Using Hubsters To Set Grade
8:55
Thomas Construction Texas
Рет қаралды 7 М.
How to calculate a Pipe Laser Slope Percentage
7:40
terry kraper
Рет қаралды 98 М.
Reading the Level Rod
10:15
Illinois Surveyor
Рет қаралды 492 М.
How to Read Elevations for Yard Drainage - The French Drain Man
20:23
FRENCH DRAIN MAN
Рет қаралды 74 М.
How to screed concrete best of
26:59
Concrete ninja
Рет қаралды 29 М.
What NOT to do in a Bulldozer | Heavy Equipment Operator
14:54
Heavy Metal Learning
Рет қаралды 1,7 МЛН
How to check grade for 3:1,2:1,1:1 slopes with a hand level
6:44
Building a earth moving company
Рет қаралды 16 М.
YouTube's Biggest Mistake..
00:34
Stokes Twins
Рет қаралды 74 МЛН