Installing the Combiner Box

  Рет қаралды 7,931

Homestead Engineering

Homestead Engineering

3 жыл бұрын

AltE Store: lddy.no/vllw
Midnight Solar Combiner Box: lddy.no/vlo0
GROUND MOUNT PARTS:
15A Combiner Box Breaker: lddy.no/vlxe
100A 150VDC Breaker: lddy.no/vlxd
50A 300VDC Breaker: lddy.no/vlxb
MC4 Connector Extension: lddy.no/vlxa
UFO Clamp: lddy.no/vlx9
IronRidge Rail Connector: lddy.no/vlx5
IronRidge 3" Top Cap: lddy.no/vlx4
IronRidge XR-1000 Rails: lddy.no/vlx3
Magnum PT-100 Charge Controller: lddy.no/vlme
Midnight Solar Combiner Box: lddy.no/vlo0
Midnight solar surge protection (115): lddy.no/vlo5
Midnight solar surge protection (300): lddy.no/vlo7
Solar Panel Cable 10AWG H4: lddy.no/vloa
BASE SYSTEM:
Magnum Inverter: lddy.no/vllz
Magnum PT-100 Charge Controller: lddy.no/vlme
Battery Monitor Kit: lddy.no/vlmi
ME-ARTR Router: lddy.no/vlmn
Trojan Battery L-16-RE-B: lddy.no/vlmp
Midnight Solar Combiner Box: lddy.no/vlo0
Midnight Solar Combiner Box DISCO: lddy.no/vlnz
Midnight solar surge protection (115): lddy.no/vlo5
Midnight solar surge protection (300): lddy.no/vlo7
Solar Panel Cable 10AWG H4: lddy.no/vloa
- Generator power cord: amzn.to/2OJmlzT
- Power Inlet Box: amzn.to/2DDzxWj
- Generac Manual Transfer: amzn.to/2xJPpjG
- A510C Pro/Tran2 Manual Transfer Switch:
amzn.to/2IboWAr
- MidNite Solar Breaker 2A 150VDC MNE-PV2
-TEMCo WC0470 - 40' (20' Blk, 20' Red) 4/0 Gauge:
amzn.to/2IeSc9a
-TEMCO Terminal Lug: amzn.to/2QWq279
-Digital Current Voltage Power Energy Meter:
amzn.to/2ONExIN
-DROK Digital Multimeter:
Small Torque Wrench: amzn.to/3lriSYh
Large Torque Wrench: amzn.to/2NhB1uR
Use these files at your own risk:
Design Doc: drive.google.com/file/d/1gvzw...
Parts List: drive.google.com/file/d/1_By9...
#CombinerBox

Пікірлер: 29
@ChrisDIYerOklahoma
@ChrisDIYerOklahoma Жыл бұрын
Awesome work! I am "finally" installing this model on my north (2,400w) array. I am installing four DIN rail Langir 250vDC (non polarized) breakers for four strings of six 100w panels. On my newly rebuilt 2,900w pergola array, I used a MNPV3 for two strings. For the earth ground, I used 4 AWG heavy stranded THHN to a 8' deep grounding rod. It "looks" correct to me and safe...but, I am not up to speed on NEC compliance. The panels "grounds" are strapped together like they say to do.
@geofferyromany4634
@geofferyromany4634 3 жыл бұрын
as a newbie I have watched a number of videos over the last 2 weeks. This is a sum of what I learned in respect to the combiner box. There is a positive bus bar on the top and there are always two lugs one on the left and the other on the right. Since the bus bar is one plate and not split into two most people use one lug for the strings and the other lug for the 300 SPD. You only installed the lug on the right but didn't install the lug on the left so all the positive wires from the 4 strings go through that lug. If you had installed the left lug then the strings would have been had the red wire leading to the conduit on the left side and the positive wire from the 300 SPD could have been placed on the right lug making the appearance much better and probably more safer ( I guess). That is what I meant.
@offgridinthepacificnorthwe3210
@offgridinthepacificnorthwe3210 3 жыл бұрын
I am going through solar withdrawals lol. April 3 is the day we start the new homestead.
@tomashbaugh8891
@tomashbaugh8891 3 жыл бұрын
David you do a wonderful job of taking an intimidating project and simply and clearly showing us how to do it! Thank you
@LogHouseFarm
@LogHouseFarm 3 жыл бұрын
There is something really pretty about a newly wired panel. I hope to replace the panels in the barn someday, they are a mess right now!
@jopiaspieder1184
@jopiaspieder1184 3 жыл бұрын
Fire it up!!!!
@decal2154
@decal2154 2 жыл бұрын
I’m doing a diy solar project and I’m stumped as to whether I should place my inverter next to my combiner box at the ground mount or in the garage.
@cowpen
@cowpen 3 жыл бұрын
If I recall, your combiner boxes for the rooftop solar had a gang cutoff switches outside the garage. Will this array have the same, or are you running straight to the charge controller?
@timmorris1838
@timmorris1838 3 жыл бұрын
What size SPD did you use, 300v or 600 ?
@sunjayjay240
@sunjayjay240 Жыл бұрын
Can u connect 220V one array
@geofferyromany4634
@geofferyromany4634 3 жыл бұрын
why did you put the positive from the 300v SPD on the same positive from the strings?
@raygibson1295
@raygibson1295
Would this particular combiner box eliminate the need for a disconnect switch for the pv strings?
@TNRonin
@TNRonin 2 жыл бұрын
Came over from the generator vid.
Off Grid Solar #34: Wiring Solar Panels to Combiner Boxes
8:41
Homestead Engineering
Рет қаралды 30 М.
IronRidge Ground Mount Solar: Concrete Rails & Panels
8:06
Homestead Engineering
Рет қаралды 14 М.
Heartwarming: Stranger Saves Puppy from Hot Car #shorts
00:22
Fabiosa Best Lifehacks
Рет қаралды 22 МЛН
Was ist im Eis versteckt? 🧊 Coole Winter-Gadgets von Amazon
00:37
SMOL German
Рет қаралды 39 МЛН
Connecting the Solar Array to a Hoffman PV Combiner Box, Off-Grid!
15:18
Installing a Midnite Solar DC Combiner Box
5:38
bluerockstation
Рет қаралды 4,9 М.
How to wire a solar charge controller and battery bank
10:54
EnergyUME
Рет қаралды 91 М.
Installing AC Electrical Panels and Midnite Solar MNSPD-300-AC Surge Protector
21:36
Around the Homestead with Sue & Ryan
Рет қаралды 982
Victron Energy Off Grid System | Easier Than You Think | Part 1
16:12
Country Living Experience: A Homesteading Journey
Рет қаралды 17 М.
Off Grid Solar #46: Lightning Arresters MNSPD-300
4:33
Homestead Engineering
Рет қаралды 12 М.
Solar Ground Mount Startup
7:41
Homestead Engineering
Рет қаралды 1,7 М.
Heartwarming: Stranger Saves Puppy from Hot Car #shorts
00:22
Fabiosa Best Lifehacks
Рет қаралды 22 МЛН