Рет қаралды 25,178
Shot over two days, this video contains:
• Final baseboards from Blakemere arrive for storage.
• We see the beginnings of scenery around the baseboard end.
• Lots of baseboard shuffling around Pete’s barn.
• Pete shows us a new section under construction.
• Sorting our balls of flocking material.
• Flocking in action again.
• John and Robin weather rails.
• Dave explains the new joinery and stands.
• We catch Chris designing the new departure boards.
• Dan talks tech.
• Phil rolls a wagon.
• Pete walks us through the new designs.
• Phil shows us CAD designs.
• A little of Pete’s 7mm layout.
• General discussion as to the organization.
More from: megapointscontrollers.com