Рет қаралды 61,225
i was doing this job twice it supposed to installed up tight to ceiling but customer change his mind and we understand that as i was actually design it in place so they did not have the chance to see a plan and i agree we were trying to finish it at the same high as kitchen, but fridge was going to be installed on a shelf too high for them and plinths was going to be 2 levels 100mm on side and 150 mm sink side.i end up starting again which was fine now i have to find a solution to attach plinths to the corner base doors so they can use all that space and to be able to reach to the pipe work for servicing
thanks watching !!