This video will guide you step by step how in taking-off a small structure in accordance with NRM2 and produce a Bill of Quantities.
00:00 Substructure, Site prep
11:42 Substructure, Foundations
13:17 Walls
23:45 Bill of Quantities production

Пікірлер: 21
@navinjangir2477
@navinjangir2477 Сағат бұрын
what a wonderful explanation .understood everything clearly. God bless you .please make a video on how to prepare a BOQ using ANZSMM. Thank you !
@geoffhodgson2492
@geoffhodgson2492 5 ай бұрын
Thanks for your kind comments, very much appreciated. I will be doing many more videos so keep watching. Geoff
@BANN9444
@BANN9444 4 ай бұрын
Geoff, this is incredibly value information. Thank you for taking the time to put this together. You are a natural on camera and provide great commentary.
@geoffhodgson2492
@geoffhodgson2492 3 ай бұрын
Thanks for your kind comments. Very much appreciated
@thehalokidster7102
@thehalokidster7102 4 ай бұрын
Great video, many thanks! It's great the way you bring it all back to referencing the NRM2. Some NRM1 videos would be absolutely amazing, with a focus on writing descriptions as well. :)
@geoffhodgson2492
@geoffhodgson2492 3 ай бұрын
Glad your licked them and thanks for your comments
@OwenNjogu-bz9ob
@OwenNjogu-bz9ob 3 ай бұрын
Thanks alot for the simple breakdown,,as a student this is more than important
@iaincrawford5472
@iaincrawford5472 3 ай бұрын
Geoff, these videos are great for everone new and old to the construction industry. It would be fantastic if you could show drainage and roads take off, and how these take-offs then form the BOQ. Very impressed by the level of quality and information in your videos.
@geoffhodgson2492
@geoffhodgson2492 3 ай бұрын
Thanks for your very kind comments Iain. I will be preparing a tutorial on drainage take-off and I also am considering tutorials on the Method of Measurement for Highway Works as well if I sense there is a demand.
@Vincent-MA94
@Vincent-MA94 5 ай бұрын
Thank you so much for this incredibly helpful video on NRM2 Take-Off & BQ production! 🙏 As a student in Quantity Surveying, clear explanations like these are absolute gold. Your breakdown of the process was spot-on and really clarified some key concepts for me. Can't wait to see more content from you in the future - your videos are a fantastic resource for students like myself trying to deepen our understanding of the field. Keep up the great work! Best Ever!
@geoffhodgson2492
@geoffhodgson2492 3 ай бұрын
Thanks for your kind comments
@JulyFighting
@JulyFighting 3 ай бұрын
My word I wish this was available when I was a student, this is really great stuff.
@MarkeziProducer
@MarkeziProducer 2 ай бұрын
Great video Geoff, thank you for explaining this to the details, it really helps.
@geoffhodgson2492
@geoffhodgson2492 Ай бұрын
Thanks for your comments and glad you have found the channel useful. There will be more videos so keep checking back
@ceemapanda4811
@ceemapanda4811 4 ай бұрын
wow thank you for breaking it down so clearly.
@charlesokoro2100
@charlesokoro2100 4 ай бұрын
I chanced on your channel just today and it has been such a blessing. I look forward to more contents. Thanks a lot.
@geoffhodgson2492
@geoffhodgson2492 3 ай бұрын
Thanks, I shall be more so watch this space
@dennismponda7805
@dennismponda7805 2 ай бұрын
Absolutely Amazing,🔥
@breemurage
@breemurage 4 ай бұрын
thank you for this
@bigpot
@bigpot 2 ай бұрын
Is disposal of excavated measured as an item without quantities, cos the excavated trench will be filled with blockwork and the remaining backfilled and excess taken off site😊
@geoffhodgson2492
@geoffhodgson2492 2 ай бұрын
Yes; under NRM2 Disposal, (5.9.1&2) is measured as an 'Item' as you say but... to calculate the amount of Filling obtained from excavated material, m3, (5.11.2) and Imported Filling, m3, (5.12.1,2 or3), the arithmatic of volume of excavation less the volume of the structure in the excavation is still maintained.
Taking off quantities with NRM2.
14:48
Duncan Cartlidge Online
Рет қаралды 4,2 М.
Ouch.. 🤕
00:30
Celine & Michiel
Рет қаралды 41 МЛН
Box jumping challenge, who stepped on the trap? #FunnyFamily #PartyGames
00:31
Family Games Media
Рет қаралды 30 МЛН
CESMM4 Take-off Worked Example
1:14:05
Geoff Hodgson
Рет қаралды 1,9 М.
TAKING OFF FOR SUPERSTRUCTURE - PART 1
35:26
QUANTITY SURVEYING ACADEMY
Рет қаралды 65 М.
HOW TO MEASURE FOR SUPER STRUCTURE [BLOCK WORK]
23:04
Quantity Surveying Workshop
Рет қаралды 1,7 М.
What is Bill of Quantity (BOQ)? Explained in Detail WIth Example
15:27
Engineering Academy
Рет қаралды 393 М.
How To Form BOQ In Excel Including All Excel Shortcuts You Need
15:21
Cost Engineering Professional
Рет қаралды 67 М.
How to Create a BoQ in Under 4 Minutes
3:58
Metroun Quantity Surveying
Рет қаралды 10 М.
How to use Centre Lines to measure composite wall areas
9:31
Geoff Hodgson
Рет қаралды 500
How to form a bill of quantities in excel from scratch
13:37
Cost Engineering Professional
Рет қаралды 85 М.
TAKING OFF QUANTITIES FOR THE SUBSTRUCTURE OF COMPLEX BUILDING PLAN - Part 1
46:30
QUANTITY SURVEYING ACADEMY
Рет қаралды 211 М.