Рет қаралды 31,080
Please watch this video with subtitles displayed.
Table of Contents
0:00 Intro
1:06 Opening
2:03 Rules Explanation
3:58 1
5:24 2
6:28 3
7:24 4
8:07 5
14:45 6
16:03 7
17:24 8
18:40 9
22:02 10
22:46 11
26:46 12
28:18 13
28:36 14
31:13 15
38:07 16
40:28 17
42:36 18
44:47 19
49:09 20
49:25 21
52:11 22
54:20 23
55:41 24
56:32 25
58:43 26
1:02:33 27
1:04:51 28
1:05:52 29
1:07:24 30
1:07:49 31
1:08:29 32
1:09:10 33
1:10:40 34
1:11:08 35
1:12:41 36
1:14:13 37
1:16:23 89
1:17:27 Conclusion
~Rules of the Journey to Run the Whole Route~.
Rule 1: You are free to set the challenge date, start, and goal. In other words, you may stay overnight before or after the challenge at a hotel near your departure or arrival point.
Rule 2: Participants may use any means of transportation other than the route of the challenge, including taxis, buses, etc. Cabs, buses, etc. are acceptable.
Rule 3: Toll trains are acceptable.
Rule 4: Sections where regular passenger trains do not run, such as freight lines, are excluded from the conditions for achievement.
Rule 5: When passing through a station, even if the train does not pass through a track adjacent to a platform, it is considered to have passed through the station if it passes through the station premises.
(In cases where it is difficult to determine whether a train passes through a station by the above rules, such as on a double-track section, the achievement criteria for each section shall be determined based on the route for fare calculation determined by each company.)
Translation of titles, descriptions, and subtitles is automatic and may contain errors in translation.
URL to purchase base food
a.r10.to/hU1wuk
References (including image sources)
Tobu Railway: www.tobu.co.jp/
Keisei Electric Railway: www.keisei.co.jp/
Wiring Diagram.net: www.haisenryakuzu.net/
Kasukabe City: www.city.kasukabe.lg.jp/index...
Blog: diagram-traveling.com/
twitter: / sd4lsh
#Tobu Railroad #1 day #Run all lines