Critical Path Analysis in P6 - 5 Things I Wish I Knew Earlier

  Рет қаралды 202,598

Plan Academy Inc.

Plan Academy Inc.

Күн бұрын

Пікірлер: 50
@mozzamahmed1005
@mozzamahmed1005 4 жыл бұрын
Excellenet, very useful tips. Very professional and clear presentation. Would love to have more tipe like this.
@nkoketsengkonopi6316
@nkoketsengkonopi6316 7 жыл бұрын
Thank you very much for such an informative video Michael. Perhaps just to expand briefly on your point as to why it is not always advisable to present the Critical path via checking the "Critical" box in the filters window, particularly before you understand what the filter is presenting exactly. Depending on the critical path settings which each individual adopts, the critical path presented when checking the above mentioned box can become quite subjective. I guess some might wonder what I mean by that. If you press F9 or the schedule icon, you will by now be aware that this will trigger the “Schedule” or scheduling window to launch. If you click on the options tab or button on the bottom right hand side of the “Schedule” window, a “Schedule Options” window will appear. The “Schedule Options” window allows you to effect all sorts of adjustments to your scheduling settings and configurations which ultimately influence the calculations that are prompted when you schedule your programme. Closer to the bottom of this window you will notice a sub-section with a description that reads “Define critical activities as”. This sub-section allows you to define how your critical path will be determined/calculated. The first option allows you to set the float value which will define which activities must be highlighted or presented as critical while the second option allows you to have the “Longest path” which is your “true critical path” presented as your critical path. By “true critical path” I mean the natural resultant critical path from a critical path analysis based on the CPM method. The first setting allows each user of the software to decide at which point an activity will be critical and this does not depend on the results of a critical path analysis as set out by the CPM method. The power to make that unilateral decision as to at which point each of the activities should be considered critical is the very reason why I say that the setting results in a pretty much subjective critical path. When the second option is selected i.e. Longest path in the same “Schedule Options” window, the “Critical” filter setting in the “Filters” window becomes the equivalent of the “Longest Path” filter setting. It will produce the same critical path as the “Longest Path” filter; which is the true critical path.
@ViaMirage
@ViaMirage 7 жыл бұрын
You have an extremely soothing type tone of voice.
@PlanAcademy
@PlanAcademy 7 жыл бұрын
Best comment of 2016! thanks!
@kehindeomotadechris5009
@kehindeomotadechris5009 6 жыл бұрын
Great, well packed and delivered.
@martinvaxjo
@martinvaxjo 3 жыл бұрын
Excellent language skills and presentation technique AND excellent quality of the video.
@user-qh2yk1xj4h
@user-qh2yk1xj4h Жыл бұрын
I have to say, You are a master in p6. How did you become such as expert in p6, what were the step you followed.
@ebail4445
@ebail4445 2 жыл бұрын
Thanks a lot mate. God bles you.
@_AJ747
@_AJ747 3 жыл бұрын
Great Professional Videos , Thank you so much....
@TheLegends66
@TheLegends66 4 жыл бұрын
Nice explanations, thanks
@marketingblueprintforcontr9070
@marketingblueprintforcontr9070 4 жыл бұрын
Great Info! Thanks
@omaralzabad506
@omaralzabad506 6 жыл бұрын
It is good. But it will be excellent if you show how to control the five point which you raise them. I mean how to solve them. For example how to make the finish date equal to must finish on? Thanks
@mohamedmasoud8493
@mohamedmasoud8493 8 жыл бұрын
u r awesome :D relationship tip is really helpful and making tracking away easier :)
@PlanAcademy
@PlanAcademy 8 жыл бұрын
+Mohamed Masoud Thanks! Glad you enjoyed it.
@rajkumars974
@rajkumars974 4 жыл бұрын
Hay, Good and Valuable information. Thanx. you didn't explain how to eliminate those decimals in Floats in the presence of Multiple calendar usage.
@PlanAcademy
@PlanAcademy 4 жыл бұрын
There is no need to remove those decimal Total Float values - they are a product of doing CPM scheduling. Just be aware of how they were there.
@rajkumars974
@rajkumars974 4 жыл бұрын
@@PlanAcademy Thats right, but i need to eliminate the issue that successor activity starts on the same day of predecessor activity finish (I believe, this comes because of when 2 different Calender meets in a p6 schedule). you have any solution for that pls?
@PlanAcademy
@PlanAcademy 4 жыл бұрын
I think that only happens if your durations are incorrect. Set your durations to show 2 decimals places. Then adjust Durations so that there are no fractional Durations. So if the Activity's Calendar has a 10hr day, the Duration has to be a 10/20/30/40 hrs. If another Activity has a calendar with an 8hr day, adjust the Duration so it's 8/16/24/32 hrs. etc. That should fix so that Activities don't start mid-day.
@rajkumars974
@rajkumars974 4 жыл бұрын
@@PlanAcademy Thanks dude, I will verify and let you know. Have a Good Day
@nawarajsigdel8987
@nawarajsigdel8987 3 жыл бұрын
please tell me when exactly the user perferance, admin perference and calendar is to be set up. can we do that after creating wbs and activities? please reply, with due respect
@sahriz110
@sahriz110 7 жыл бұрын
you made my life easier ;-)
@muhammadumair5759
@muhammadumair5759 4 жыл бұрын
Great Help all of your videos.... I wish I could give you million views
@PlanAcademy
@PlanAcademy 4 жыл бұрын
I wish you could too! very pleased you're getting the benefits from our videos.
@xijb
@xijb 4 жыл бұрын
Hi. Here is a link to more customized training on P6 . Please like and subscribe to this channel. New content is uploaded everyday
@ninerout399
@ninerout399 4 жыл бұрын
Should rarely, if ever, establish a Must Finish By Date in the project screen
@AhmedAli-dj9jo
@AhmedAli-dj9jo 5 жыл бұрын
Thank you so much
@xijb
@xijb 4 жыл бұрын
Hi. Here is a link to more customized training on P6 . Please like and subscribe to this channel. New content is uploaded everyday
@mohanrao4402
@mohanrao4402 6 жыл бұрын
Thank you so much sir.....
@hussienmohamed5101
@hussienmohamed5101 7 жыл бұрын
Thank you very much, if can share the primavera file
@galavdani6684
@galavdani6684 8 жыл бұрын
Awesome sir ...
@projectplanner8644
@projectplanner8644 7 жыл бұрын
It was great, tnx a lot!
@MoeKAPMI
@MoeKAPMI 6 жыл бұрын
Hello, I am a very beginner. My question is : how can we have two windows at the bottom of the screen simultaneously?
@umerjaved8581
@umerjaved8581 7 жыл бұрын
hi dear. at point 8:29 in successor activity tab you use one short cut key and then you press ok.what was that shortcut key. keep on sharing good information best of luck dear
@PlanAcademy
@PlanAcademy 7 жыл бұрын
Hi Umer, I didn't use a shortcut key. It looks like I edited out that brief section of the video where I simply added the same columns as I did in the predecessor section.
@umerjaved8581
@umerjaved8581 7 жыл бұрын
got it :-)
@engabdullahch
@engabdullahch 7 жыл бұрын
I thought so same but then I realized he must've skipped the steps to make the video short.
@xijb
@xijb 4 жыл бұрын
Hi. Here is a link to more customized training on P6 . Please like and subscribe to this channel. New content is uploaded everyday
@markrex13
@markrex13 8 жыл бұрын
thanks a lot.
@lolajeha4416
@lolajeha4416 5 жыл бұрын
I just saw a TF of 113 days! this is not normal.. i think the schedule is full of constraints and this is the main cause of the weird critical path you've got
@thienthu4678
@thienthu4678 4 жыл бұрын
can we filter function with "WBS name"? tks so much
@PlanAcademy
@PlanAcademy 4 жыл бұрын
Yes you can
@user-ip4wu4mr7j
@user-ip4wu4mr7j 7 жыл бұрын
Hi, what is a judge task and how to nudge some tasks in primavera? Thanks
@jjcool4460
@jjcool4460 7 жыл бұрын
When I am looking at my activities my WBS tabs are not shown. How do I get that to happen?
@mohamednias2580
@mohamednias2580 3 жыл бұрын
Give refresh
@rolandkanu7194
@rolandkanu7194 7 жыл бұрын
IS THERE A SITE I CAN DOWNLOAD FREE VERSION OF P6
@rafaelcallegario8509
@rafaelcallegario8509 7 жыл бұрын
Well I just downloaded it for free from oracle's website. Don´t know however if it´s a demo version. There are some videos in youtube showing how to download and install it.
@tylerlowry928
@tylerlowry928 Жыл бұрын
This is definitely not the p6 I was looking for 😂 I was looking for the testosterone boost
@projectcontrolconsultantsp140
@projectcontrolconsultantsp140 7 ай бұрын
Very basic , come on share something more interesting
The Problem with Longest Path in Primavera P6 and how you can fix it
6:03
Resource Loading in Primavera P6 - 5 Tips to make it EASIER
8:11
Plan Academy Inc.
Рет қаралды 28 М.
Мы сделали гигантские сухарики!  #большаяеда
00:44
Cute kitty gadgets 💛
00:24
TheSoul Music Family
Рет қаралды 12 МЛН
Test for THIS - When Hiring P6 Schedulers
6:30
Plan Academy Inc.
Рет қаралды 2,4 М.
What P6 Schedule Comparison Tool Should You Use?
26:52
Plan Academy Inc.
Рет қаралды 9 М.
P6 Primavera Scheduling for Beginners - How-To Video
28:02
Donny Holmes
Рет қаралды 92 М.
Are YOU Using this Primavera P6 Float Paths Feature?
10:06
Plan Academy Inc.
Рет қаралды 15 М.
Why Half-Step Progressing is so Important!
6:54
Plan Academy Inc.
Рет қаралды 3,2 М.
How to Get HIRED in Project Controls - ADVICE from a Recruiter
8:48
Plan Academy Inc.
Рет қаралды 1,7 М.
Primavera P6 Layout for EASY Earned Value Analysis
8:52
Plan Academy Inc.
Рет қаралды 11 М.
Мы сделали гигантские сухарики!  #большаяеда
00:44