Work Performance Data, Information, & Report: Master the Differences in 10 Minutes for your PMP Exam

  Рет қаралды 4,619

EduHubSpot

EduHubSpot

Күн бұрын

If you ask PMP aspirants to choose one concept that’s confusing, I am sure most of them will choose the difference between WPD, WPI and WPR as one of the concepts. In this video, our lead trainer and Project Management Mentor Gautham Sudakar dives deep into the world of work performance data (WPD), work performance information (WPI), and work performance reports (WPR).
Learn the key differences between these concepts and how they impact project management.
We'll walk you through a practical example, showcasing how data is collected, transformed into information, and finally presented in a report to stakeholders. This step-by-step process will help you better understand how to effectively manage and communicate project progress.
📝 Timestamps:
🕒 00:00 - Introduction
🕒 01:18 - Work Performance Data (WPD) Explained - Work Performance Data (WPD) is the raw data collected from various project areas, such as planned and actual performance, budget, and status.
 Data collection is crucial for effective project management.
 Examples include: hours worked, tasks completed, and resources used.
Practical Example -Gautham walks through a detailed, real-life example to demonstrate the transition from WPD to WPI and finally to WPR. This example helps viewers visualize how these concepts apply to real projects and the importance of each step in the process.
🕒 05:25 - Work Performance Information (WPI) Explained - Work Performance Information (WPI) is the result of analyzing and comparing the collected work performance data.
 This step involves identifying variances, trends, and potential issues in the project.
 Examples include: schedule variance, cost variance, and overall project progress.
🕒 07:35 - Work Performance Reports (WPR) Explained - Work Performance Reports (WPR) are the presentations or documents that contain work performance information, formatted for easy consumption by stakeholders.
 This is the final step in effectively communicating project performance.
 Examples include: project status reports, project dashboards, and variance analysis reports.
🕒 08:23 - Interactive Test -The test at the end of the video allows viewers to apply their knowledge of WPD, WPI, and WPR. Here is a list of items as promised in the video
 Number of defects found.
 Finish dates of activities
 Deliverable status.
 Number of change request completed.
 Implementation status of change request.
 Status reports representing implementation status of change request.
 Electronic dashboard representing deliverable status.
Please segregate these items in WPD, WPI, and WPR and make sure you give your reasoning behind the answer in comments section below, where Gautham will personally respond to submissions.
🕒 9:02 - Conclusion
Don't miss the test at the end of the video! This interactive challenge will help you validate your understanding of these concepts. Grab your notepad, and let's get started! Be sure to leave your answers in the comments section, and Gautham will personally respond to your submissions.
Join us on this educational journey, and solve your work performance data, information, and report related PMP Questions easily! Happy learning, and don't forget to like, share, and subscribe the EduHubspot Channel for more project management insights!
For any queries, reach out to Gautham at Gautham.sudakar@eduhubspot.com
Connect with me on LinkedIn directly : / gautham-sudakar-pmp%c2...
Visit our website www.eduhubspot.com today and discover how the PMP Mindset tool can help you achieve greater success in your career!
Do check out our PMI Approved PMP Program at:
www.eduhubspot.com/packages/pmp
Also, you can email our support team for more questions at services@eduhubspot.com
Connect with us on WhatsApp: wa.me/message/XVI7DMTEACX7L1
Subscribe to our KZfaq Channel: goo.gl/2ZjpEq

Пікірлер: 166
@SubhankarDey-mr9um
@SubhankarDey-mr9um 3 ай бұрын
You have made it so easy. thanks Gautam.
@EduHubSpot
@EduHubSpot 3 ай бұрын
Thanks for liking ! Gautham
@crispingeorge2502
@crispingeorge2502 Жыл бұрын
Hi Gautham, Grateful for taking your time to explain this concept. Q(1,2 &4) refer to work performance data; since they are talking about raw observations/measurements. Q(3&5) refer to work performance information; status of WPD being performed. Q(6&7) refer to work performance report; physical or electronic representation of WPI. Regards
@EduHubSpot
@EduHubSpot Жыл бұрын
Loving your thought process. Gautham
@mohitmhatre5021
@mohitmhatre5021 5 ай бұрын
Excellent!
@EduHubSpot
@EduHubSpot 5 ай бұрын
Glad you liked it! Gautham
@krishnar.p1966
@krishnar.p1966 7 ай бұрын
Hi Gautham, It is very interesting to listen to your videos and iassume it will stay in our mind forever. Thanks. WPD - collecting on plan and execution, it should be raw observation (1,2,4) WPI - it is comparing and finding actual progress, it should be some status, here deliverable and implementatation "status" (3, 5) WPR - It is a representation of the WPI, here representation of "deliverable and implementatation "status"" (6,7)
@EduHubSpot
@EduHubSpot 7 ай бұрын
Loving your thought process. Gautham
@sameershaikh-km3xr
@sameershaikh-km3xr 4 ай бұрын
Very Good Explained with Examples!!! 1,2,4 is WPD. And 3,5 is WPI and 6,7 are WPR
@EduHubSpot
@EduHubSpot 4 ай бұрын
Very impressive!! Gautham
@priyankaali06
@priyankaali06 10 ай бұрын
Thanks a lot gautam for this
@EduHubSpot
@EduHubSpot 10 ай бұрын
I am glad you loved my video. Gautham
@pushpafire2715
@pushpafire2715 Жыл бұрын
Thank you gautham...
@EduHubSpot
@EduHubSpot Жыл бұрын
Your Most Welcome Satish !! Gautham
@gajasen
@gajasen 11 ай бұрын
@Gautham I loved the way you explained this concept. It would stay fresh in my mind. Work Performance Data : Number of defects found, finish dates of activities, as these are the raw information. Work Performance Information - Deliverable Status, No. of change request completed Implementation status of change request This information is derived by comparing the actual vs planned and hence it helps in arriving at the status of the project. Work Performance Report : Status reports representing implementation status of change request. Electronic dashboard representing deliverable status. These are the electronic representation of the information for quick presentation to the leadership team.
@EduHubSpot
@EduHubSpot 11 ай бұрын
Loving your thought process. Gautham
@manishashetty7965
@manishashetty7965 9 күн бұрын
Thank you Gautam, WPD - Raw Data collecting plan & actual progress  Number of defects found. = WPD  Finish dates of activities = WPD  Implementation status of change request = WPD WPI Comparing plan and Actual progress  Deliverable status. = WPI  Number of change request completed. = WPI WPI gathered and presented through Electronic Representation - WPR  Status reports representing implementation status of change request = WPR  Electronic dashboard representing deliverable status= WPR
@EduHubSpot
@EduHubSpot 6 күн бұрын
Very impressive!! Gautham
@tejeswararaobudumuru9206
@tejeswararaobudumuru9206 Жыл бұрын
Hi Gautham, Item-1: WPD. It's just actual data and there will never be planned defects to compare the actual defects. Item-2: WPD. It's just finish dates of activities . If we compare actual finish dates with planned finish dates, we can know the project status. Item-3: WPI. It provides the project status. Item-4: WPD. It's just data. It won't provide the project status. Item-5: WPI: It derives from planned vs actual and can provide the project status Item-6 &7: WPR: They are representations of project status
@EduHubSpot
@EduHubSpot Жыл бұрын
Really loved your thought process. I need to steal this reasoning. Hahah !! Gautham
@jpsinghditp
@jpsinghditp 2 ай бұрын
@@EduHubSpot @tejeswararaobudumuru9206 Awesome explaination
@keralguy
@keralguy 5 күн бұрын
Hi Gautham, Thanks for the wonderful explanation, and I have understood the concept well in about 15 minutes. Qn (1,2 &4) refer to Work Performance Data since they are talking about Data Collection, collecting Plans and Actuals Qn (3&5) refer to Work Performance Information as they are comparing Plan vs Actual progress. Qn (6&7) refer to Work Performance Report as they are electronic representation of Work Performance Information Thank You once again With Regards Riyad
@EduHubSpot
@EduHubSpot 2 күн бұрын
That is exactly how you should think. Gautham
@SaurabhGupta-fl1vp
@SaurabhGupta-fl1vp 3 ай бұрын
Great Explanation:  Number of defects found. -- WPD -- Raw data  Finish dates of activities -- WPD -- Raw data  Deliverable status. -- WPI -- compared status  Number of change request completed. -- WPD -- Raw data  Implementation status of change request. -- WPI -- compared status  Status reports representing implementation status of change request. -- WPR -- Report  Electronic dashboard representing deliverable status. -- WPR -- Report
@EduHubSpot
@EduHubSpot 3 ай бұрын
Very Impressive !! Gautham
@ilanchezian822
@ilanchezian822 5 ай бұрын
Excellent
@EduHubSpot
@EduHubSpot 5 ай бұрын
Thank you so much 😀 Gautham
@harishankar4005
@harishankar4005 Жыл бұрын
Well explained concept and so nicely done with an example. Nice one Gautham. As for answers, 1)Defects = WPD = These are defect numbers found and actuals "collected" (collect is the key word 2)Finish dates = WPD = Raw data with collection of dates . 3)Deliverable status = WPI = this is comparing the actual vs planned and according will give the deliverable status whether we are ahead or behind schedule etc. 4)# of CR's completed = WPD = these are numbers for the actuals completed and no comparison 5)Status of CR = WPI = Status means comparing current vs planned data and hence WPI 6) & 7 ) WPR = The name itself says reporting and Electornic representation so self explanatory
@EduHubSpot
@EduHubSpot Жыл бұрын
Loving your thought process. Gautham
@kafilahmad
@kafilahmad 8 ай бұрын
Thank you
@EduHubSpot
@EduHubSpot 7 ай бұрын
You're welcome !! Gautham
@user-nt8ww1mu2q
@user-nt8ww1mu2q Жыл бұрын
Hi, Gautham, concept was explained very well, and you rocked as always with your real-life example explanation. thanks  A number of defects were found. -WPD  Finish dates of activities -WPD  Deliverable status. -WPI  A number of change requests were completed. -WPD  Implementation status of a change request. -WPI  Status reports represent the implementation status of change requests. -WPR  Electronic dashboard representing deliverable status. -WPR
@EduHubSpot
@EduHubSpot Жыл бұрын
Thanks Vasundhara for lovely comment. 7 out of 7, very impressive !! Gautham
@sharmilapratap343
@sharmilapratap343 9 күн бұрын
Thank you Gautam for making it so simple and easy. So for me:  Number of defects found = WPD as it will be just actual data of defects  Finish dates of activities = Again WPD, where later we can use this information for comparison.  Deliverable status. = WPI as it gives project status  Number of change request completed. = WPD  Implementation status of change request.= WPI as we can compare  Status reports representing implementation status of change request. WPR = Presentation of status report  Electronic dashboard representing deliverable status. WPR = Electronic representation
@EduHubSpot
@EduHubSpot 6 күн бұрын
Loving your thought process. Gautham
@PradyDas
@PradyDas Жыл бұрын
Hi Gautham, thanks again for such a wonderfully explained video. Work Performance Data: Number of Defects Found, Finish Date of Activities, Number of Change Request Completed. Reasoning : These are Raw data and does not convey any status of the project on their own. Work Performance Information: Deliverable Status and Implementation Status of Change Request Reasoning: These signify some sort of status about the project which is derived by comparing raw project data Work Performance Reports: Status Reports representing Implementation Status of Change Request and Electronic Dashboard representing Deliverable Status Reasoning: These are electronic representation of the Work performance Information and hence these are Work Performance Reports.
@EduHubSpot
@EduHubSpot Жыл бұрын
Really loved your thought process. I need to steal this reasoning. Hahah !! Gautham
@priyankar3532
@priyankar3532 7 ай бұрын
Smashing the like 🎉
@EduHubSpot
@EduHubSpot 7 ай бұрын
Thanks for loving the video. Gautham
@poojanewar2912
@poojanewar2912 Жыл бұрын
Hi Gautham, The concept is very well explained. Work Performance Data: 1, 2, 4 as these just represent the data and we cannot arrive at the status of the project Work Performance Information: 3, 5 as these represent the project status Work Performance Report: 6, 7 as these are the reports
@EduHubSpot
@EduHubSpot Жыл бұрын
Awesome job!! Gautham
@nehapashiney4045
@nehapashiney4045 2 ай бұрын
Perfectly explained.... @Gautham.....Thank you  Number of defects found - WPD  Finish dates of activities - WPD  Deliverable status - WPI  Number of change request completed - WPD  Implementation status of change request - WPI  Status reports representing implementation status of change request - WPR  Electronic dashboard representing deliverable status - WPR
@EduHubSpot
@EduHubSpot Ай бұрын
That is exactly how you should think. Gautham
@ajithkumaraj2516
@ajithkumaraj2516 2 ай бұрын
Superb!! Thanks for the excellent well presented explanation with samples. No books or notes needed anymore. Sorry over confident and happy after listening to the video... Kindly review and let me know your feedback...  Number of defects found. - WPD - Collecting Actual Raw Data  Finish dates of activities - WPD - Collecting Actual Progress - Raw Data  Deliverable status. - WPI - Comparing Data  Number of change request completed. - WPD - Collecting Actual Raw Data  Implementation status of change request. - WPI - Comparing Data  Status reports representing implementation status of change request. - WPR - Report presentation based on WPI  Electronic dashboard representing deliverable status. - WPR - Electronic Representation of WPI
@EduHubSpot
@EduHubSpot 2 ай бұрын
Very impressive!! Gautham
@Theresa-wr8hc
@Theresa-wr8hc Жыл бұрын
Hi Gautham, I really loved the explanation. thanks #defects -WPD Finish dates - WPD Delivery status - WPI #change request - WPD Implem status - WPI Status rpt rep imple status - WPR Electronic Dash - WPR
@EduHubSpot
@EduHubSpot Жыл бұрын
Glad you liked it, Theresa. Your answers are correct!. Great job Gautham
@damanpreetsyber6668
@damanpreetsyber6668 Жыл бұрын
Hi Gautham, very well explained. Numbers of Defects Found : is a work performance DATA. Finish Dates of Activities : is a work performance data. Deliverable Status :- is a work performance information Number of change request completed : Data Implementation status of change request : Information Status report representing implementation status of change request : Report Electronic Dashboard representing deliverable status : Report.
@EduHubSpot
@EduHubSpot Жыл бұрын
Keep up the good work!! Gautham
@ruwanthiharshanie7761
@ruwanthiharshanie7761 Жыл бұрын
Hi Gautham, Work Performance Data: These are row data which can be used for decision making; 1. Number of defects found, (This can be compared with estimated number of defects to come up with useful WPI) 2. finish dates of activities, ( This can be compared with planned finish dates of activities to come up with useful WPI) 4. Number of change requests completed ( This can be compared with number of change requests planned to complete, to come up with useful WPI) Work Performance Information: These are found after processing the data; comparing planned and actual data 3. Deliverable Status, (whether the delivery is complete or delayed or whatever the current status can only be determined with comparing the planned and actual progress data) 5. Implementation Status ( this also can be determined with comparing planned and actual progress data) Work Performance Reports:This is the presentable format of the information on status 6. Status reports representing implementation status of change request, 7. Electronic dashboard representing deliverable status
@EduHubSpot
@EduHubSpot Жыл бұрын
Really loved your thought process. I need to steal this reasoning. Hahah !! Gautham
@narawseedagaj
@narawseedagaj Жыл бұрын
Implementation status of change request - WPI , comparing with Plan on number of change request implemented so far
@EduHubSpot
@EduHubSpot Жыл бұрын
Very impressive!! Gautham
@azabohassan9593
@azabohassan9593 Жыл бұрын
1,4and 5 are wpi cos defects found are after implementation of raw data,no.of change request completed and implementation status of changes request are due to a result of implantation of wpd. Finish date and deliverables status are the wpd what's to be implemented Last two are report of what is implemented so that its easier for one to understand in simple way than many words.
@EduHubSpot
@EduHubSpot Жыл бұрын
Correct Answers : 1. Number of defects found - WPD 2. Finish dates of activities - WPD 3. Deliverable status - WPI 4. Number of change request completed - WPD 5. Implementation status of change request - WPI 6. Status reports representing implementation status of change request - WPR 7. Electronic dashboard representing deliverable status - WPR Gautham
@narawseedagaj
@narawseedagaj Жыл бұрын
First two are the WPD - no of defects and finish date are collected data
@EduHubSpot
@EduHubSpot Жыл бұрын
Awesome job!! Gautham
@mailtoaravindan
@mailtoaravindan 5 ай бұрын
Hi Gautham, As always, great explanation... My answers below... WPD - 1,2,4 (All three involves collecting raw data) WPI - 3,5 (Status update is Information) WPR - 6,7 (Representing the status is report)
@EduHubSpot
@EduHubSpot 5 ай бұрын
Very Impressive !! Gautham
@jagdishpurohit928
@jagdishpurohit928 Жыл бұрын
Hi Gautham, well explained; short & simple.... WPD(Data)-1, 2, 4 WPI(Status)- 3 , 5 WPR(Reports/Electronic version)-6,7
@EduHubSpot
@EduHubSpot Жыл бұрын
Fantastic job Jagdish Regards, Gautham
@DeyDiscoveries
@DeyDiscoveries Жыл бұрын
Implementation of change request-WPI
@EduHubSpot
@EduHubSpot Жыл бұрын
Keep up the good work!! Gautham
@santoshpanda9762
@santoshpanda9762 Жыл бұрын
WPD- 1,2,3,4- All these are Raw observations, WPI-5,6- It is Status ( Comparison between Plan & Actual) WPR-7- Which is a electronic representation of Status Information The terms are well explained in a simple words
@EduHubSpot
@EduHubSpot Жыл бұрын
Correct Answers : 1. Number of defects found - WPD 2. Finish dates of activities - WPD 3. Deliverable status - WPI 4. Number of change request completed - WPD 5. Implementation status of change request - WPI 6. Status reports representing implementation status of change request - WPR 7. Electronic dashboard representing deliverable status - WPR Gautham
@savitachetan12
@savitachetan12 Жыл бұрын
Hi Gautham, Work Performance Data: 1, 2, 4 give data of planned or actual Work Performance Information: 3, 5 give compared result of the data I:e status information Work Performance Report: 6, 7 these are dashboard representation of information .
@EduHubSpot
@EduHubSpot Жыл бұрын
Very impressive!! Gautham
@gayatrimarathe999
@gayatrimarathe999 7 ай бұрын
Mayuresh Kotwal - WP Data Number of defects found - this is gathering data Finish date of activities - this is checking either planned or actual Number of change request completed WP Information Deliverable status - this is information as after comparing the planned and actual we will understand the status Implementation status of CR - this will be derived based on the comparison Status reports representing implementation status of CR - well, this is confusing but as electronic representation is not done, this should be under information WP Report Electronic Dashboard representing deliverable status - this is ELECTRONICALLY representing the status hence should be under report
@EduHubSpot
@EduHubSpot 7 ай бұрын
Status reports representing implementation status of change request - WPR Gautham
@arbendodajarben6923
@arbendodajarben6923 Жыл бұрын
from no.1 to no.5 are WPD, because are collecting informations and there are not comparing to anything. No.5 is WPI-1 , because compare one ork performance called "implementaion status of change request". No.6 is WPD- because collect the status of deliverable.
@EduHubSpot
@EduHubSpot Жыл бұрын
Correct Answers : 1. Number of defects found - WPD 2. Finish dates of activities - WPD 3. Deliverable status - WPI 4. Number of change request completed - WPD 5. Implementation status of change request - WPI 6. Status reports representing implementation status of change request - WPR 7. Electronic dashboard representing deliverable status - WPR Gautham
@ajoydas9863
@ajoydas9863 5 ай бұрын
HI GAUTHAM ; Work performance data: 1,2,4 work performance information: 3,5 work performance report : 6,7
@EduHubSpot
@EduHubSpot 5 ай бұрын
Very Impressive !! Gautham
@shubhrasaxena3532
@shubhrasaxena3532 8 ай бұрын
1,2,4- work performance data (because these are actual number of defects found, actual finish dates and actual number of change requests completed) 3,5- Work performance information (actual progress status) 6,7- work performance reports- representation of project status
@EduHubSpot
@EduHubSpot 7 ай бұрын
Loving your thought process. Gautham
@narawseedagaj
@narawseedagaj Жыл бұрын
Deliverable status - WPI , compared with plan and actual
@EduHubSpot
@EduHubSpot Жыл бұрын
Great job!! Gautham
@pamelaakothondiek3812
@pamelaakothondiek3812 Жыл бұрын
1.Number of defects found is work performance information; 2. Finish dates of activity is work performance data as it is what will be used during progress and reporting; 3. Deliverable status is work information; 4. Number of change request completed is work performance report; 5. implementation status of the change request is work performance information; 6. status report representing implementation status of change request is a work performance report because it is electronically represented; 7. Electronic dashboard representing deliverable status is a work performance report because it is electronically represented.
@EduHubSpot
@EduHubSpot Жыл бұрын
Correct Answers : 1. Number of defects found - WPD Gautham
@naveengs1417
@naveengs1417 10 ай бұрын
Hi Gautham Number of Defects Found This is WP Data because - its represents the collection. Finish Dates of Activities This is WP Data as again its collection of data Deliverable Status This is WP Information - Status represents - we can compared Plan vs Actuals Number of Change request completed This is WP Data - represents collection of data Implementation status of change request This is WP Information - Status always shows Planned vs Actual Status reports representing Implementation status of change request This is WP Reports - Status reports is keyword here to call it as WPR Electronic Dashboard representing Deliverable status This is WP Reports - Electronic data representation is example of WPR thank you
@EduHubSpot
@EduHubSpot 9 ай бұрын
Loving your thought process. Gautham
@vidyasagarpinapa7713
@vidyasagarpinapa7713 Жыл бұрын
First three statements are work performance data,and next two statements are work performance information and last two statements are work performance reports.
@EduHubSpot
@EduHubSpot Жыл бұрын
Correct Answers : 1. Number of defects found - WPD 2. Finish dates of activities - WPD 3. Deliverable status - WPI 4. Number of change request completed - WPD 5. Implementation status of change request - WPI 6. Status reports representing implementation status of change request - WPR 7. Electronic dashboard representing deliverable status - WPR Gautham
@shivaniyadav2896
@shivaniyadav2896 Жыл бұрын
1 & 2 : WPD as thry are raw data 3, 4 & 5 : WPI as they are statuses of raw data turned into information 6 & 7 : WPR as they are representations to stakeholder(s) after calculation
@EduHubSpot
@EduHubSpot Жыл бұрын
Correct Answers : 1. Number of defects found - WPD 2. Finish dates of activities - WPD 3. Deliverable status - WPI 4. Number of change request completed - WPD 5. Implementation status of change request - WPI 6. Status reports representing implementation status of change request - WPR 7. Electronic dashboard representing deliverable status - WPR Gautham
@MSK80J7
@MSK80J7 7 ай бұрын
1,2,4-Work performance data 3,5-Work performance information 6,7-Work performance report
@EduHubSpot
@EduHubSpot 7 ай бұрын
Awesome job!! Gautham
@janeogbu5249
@janeogbu5249 2 ай бұрын
work performance data: 2- finish dates of activities 3 - deliverable status 5- implementation status of change all these are giving performance data about various work. Work performance information: 1- number of defects found 4 - number of change request completed these are comparing one data with another data given, like number of defects found in a total item, good one and the defected ones. Same with no 4. It is comparing change request completed with the total change request raised. Work Performance Report: 6- status report representing implementation of status of change request- reason ( it's a representation showing a report of an information. 7- electronic dashboard representing deliverable status- reason ( it is a report represented electronically
@EduHubSpot
@EduHubSpot 2 ай бұрын
Correct Answers : 1. Number of defects found - WPD 2. Finish dates of activities - WPD 3. Deliverable status - WPI 4. Number of change request completed - WPD 5. Implementation status of change request - WPI 6. Status reports representing implementation status of change request - WPR 7. Electronic dashboard representing deliverable status - WPR Gautham
@mohinimahto3119
@mohinimahto3119 7 ай бұрын
Work Performance Data - 1,2,4 are data collected in terms of numbers what we fetch. Work performance Information- 3, 5 shows the status of the project , where we are or what actually has been covered so far. Work performance Report-6, 7 - shows how we represent the project status to the higher Management or the key stakeholders
@EduHubSpot
@EduHubSpot 7 ай бұрын
Loving your thought process. Gautham
@remosumo12
@remosumo12 3 ай бұрын
WPD - Collecting Plan and Collecting Actual Progress 1. Number of Defects found. 2. Finish Dates of Activities. 4. Number of CRs completed. WPI - Comparing Plan and Actual Progress 3. Deliverable Status. 5. Implementation status of CR. WPR - An electronic representation of WPI 6. Status reports representing the implementation status of CR. 7. Electronic Dashboard representing Deliverable Status.
@SvetaBes
@SvetaBes 6 ай бұрын
1 - data 2 - data 3 - information 4 - data 5 - data 6 - report 7 - report
@EduHubSpot
@EduHubSpot 5 ай бұрын
5. Implementation status of change request - WPI Gautham
@DeyDiscoveries
@DeyDiscoveries Жыл бұрын
Number of change request completed-WPI
@EduHubSpot
@EduHubSpot Жыл бұрын
Correct Answer : 4. Number of change request completed - WPD Gautham
@narawseedagaj
@narawseedagaj Жыл бұрын
Last two are WPR - because status report and electronic report are the key words
@EduHubSpot
@EduHubSpot Жыл бұрын
That is exactly how you should think. Gautham
@narawseedagaj
@narawseedagaj Жыл бұрын
Number of change request completed - WPD , actual number change request collected
@EduHubSpot
@EduHubSpot Жыл бұрын
Keep up the good work!! Gautham
@kapoorvishal4446
@kapoorvishal4446 10 ай бұрын
Hi Gautham,  Number of defects found. --> WPD, as it gives the data information  Finish dates of activities --> WPD, same I am getting some data information  Deliverable status. --> WPI as it gives the status of delieverables  Number of change request completed. --> WPD, same I am getting some data information  Implementation status of change request. --> WPI as it gives the status of change request  Status reports representing implementation status of change request. --> WPR as it is report  Electronic dashboard representing deliverable status. --> WPR as it is report
@EduHubSpot
@EduHubSpot 10 ай бұрын
Loving your thought process. Gautham
@ashrutisaxena8725
@ashrutisaxena8725 Жыл бұрын
WPD- 1,2,4 as they represent raw data WPI- 3,5 are WPI as they are comparing the status WPR: 6,7
@EduHubSpot
@EduHubSpot Жыл бұрын
Very impressive!! Gautham
@nishadibrahim5347
@nishadibrahim5347 11 ай бұрын
1. WPD - this represent raw data on the number of defects 2. WPD - represent raw data of finish dates 3.WPI - this represent the comparison of the plan with the actual progress 4. WPD - Raw data in the form of change request numbers 5.WPI - this mentions about the status 6.WPR - states about the status report 7.WPR - Electronic report of WPI
@EduHubSpot
@EduHubSpot 11 ай бұрын
Loving your thought process. Gautham
@AlokKumar-li6jz
@AlokKumar-li6jz Жыл бұрын
Hi Gautham below are the answers with explanation: 1,2,4 are WPD here data is collected in the form of number, dates as we are collecting actual progress 3,5 is WPI as we are getting the progress through status 6,7 is WPR over here representation of work performance information
@EduHubSpot
@EduHubSpot Жыл бұрын
Very impressive!! Gautham
@sanatpatra
@sanatpatra 10 ай бұрын
Hi Gautham, 1. Number of defects found Work performance Information - As this can be only found after looking in to work performance Data. 2. Finish dates of activities Work performance Data - Dates are part of your data. 3. Deliverable Status. Work performance Data - Status is also part of the data. 4. Number of change requests completed. Work Performance Data - This will also be reflected in the data. 5. Impelementation status of change request. Work Performance Data - All related statuses will be part of the data. 6. Status reports representing the implementation status of change requests. Work performance Report - This will be based on data collected and then a comparison is done on information and finally projected on the report. 7. Electronic Dashboard representing deliverable status. Work performance Report - Dashboard / Report will be obtained from the information. Cheers........
@EduHubSpot
@EduHubSpot 10 ай бұрын
Correct Answers : 1. Number of defects found - WPD 2. Finish dates of activities - WPD 3. Deliverable status - WPI 4. Number of change request completed - WPD 5. Implementation status of change request - WPI 6. Status reports representing implementation status of change request - WPR 7. Electronic dashboard representing deliverable status - WPR Gautham
@parbodhkumar
@parbodhkumar 2 ай бұрын
Item 1 - WPD (it is an individual raw observation) Item 2 - WPD (it is an individual raw observation) Item 3 - WPI (Because we reach useful information after analyzing data) Item 4 - WPD (it is an individual raw observation) Item 5 - WPI (Because we reach useful information after analyzing data) Item 6 - WPR (Because it represents the status of implementation. Even if it is not mentioned as electronic representation but tells status) Here, I am confused about whether it is mandatory to look for the word electronic to designate it as WPR. Kindly clarify. Item 7 - WPR (Here it is mentioned that it is an electronic dashboard that represents status)
@EduHubSpot
@EduHubSpot Ай бұрын
That is exactly how you should think. Gautham
@washidali3122
@washidali3122 Жыл бұрын
WPD - 1, 2, 4 (Data) WPI - 3, 5 (Status) WPR - 6, 7 (Report)
@EduHubSpot
@EduHubSpot Жыл бұрын
Keep up the good work!! Gautham
@aditibhargava8307
@aditibhargava8307 Жыл бұрын
WPD - 1, 2 and 4 they ar raw data on number of defects and dates WPI - 3 and 5 . They speak of status WPR - Last two as they show reports
@EduHubSpot
@EduHubSpot Жыл бұрын
Keep up the good work!! Gautham
@samsonolufemiajayi650
@samsonolufemiajayi650 Жыл бұрын
Number 1,2,4-WPD - raw data Number 3and 5-WPI. _deliverable status NUMBER 6and 7-WPR _electronic representation of WPI
@ketansoni8246
@ketansoni8246 Жыл бұрын
WPD 1;2 & 4 RAW DATA WPI 3 &5 status of spk WRP 6& 7 representation of WPI
@EduHubSpot
@EduHubSpot Жыл бұрын
@@samsonolufemiajayi650 : This is great Samson Gautham
@EduHubSpot
@EduHubSpot Жыл бұрын
@@ketansoni8246 Great job Soni Gautham
@nitindhage856
@nitindhage856 Жыл бұрын
WPD - 1, 2 & 3 WPI - 4 & 5 WPR - 6 & 7
@EduHubSpot
@EduHubSpot Жыл бұрын
Correct Answers : 1. Number of defects found - WPD 2. Finish dates of activities - WPD 3. Deliverable status - WPI 4. Number of change request completed - WPD 5. Implementation status of change request - WPI 6. Status reports representing implementation status of change request - WPR 7. Electronic dashboard representing deliverable status - WPR Gautham
@kainaatayranr6000
@kainaatayranr6000 10 ай бұрын
 Number of defects found.- WPD (just no. of defects found is a collection of Data)  Finish dates of activities- WPD (This is again im collecting the data)  Deliverable status.- WPI (Im sharing the status of a deliverable which is a Information)  Number of change request completed.- WPI( No. of changes completed int he sense actioned, which is nothing but information  Implementation status of change request.-WPI( Information which helps in comparing with actuals)  Status reports representing implementation status of change request.- WPR  Electronic dashboard representing deliverable status- WPR ( Any status flashed on electronics dashboard using data & information is called report status)
@EduHubSpot
@EduHubSpot 10 ай бұрын
Correct Answers : 1. Number of defects found - WPD 2. Finish dates of activities - WPD 3. Deliverable status - WPI 4. Number of change request completed - WPD 5. Implementation status of change request - WPI 6. Status reports representing implementation status of change request - WPR 7. Electronic dashboard representing deliverable status - WPR Gautham
@DeyDiscoveries
@DeyDiscoveries Жыл бұрын
Finished dates of activities- WPD raw data
@EduHubSpot
@EduHubSpot Жыл бұрын
Awesome job!! Gautham
@katkepranav
@katkepranav 10 ай бұрын
WPD - 2 WPI - 3, 1, 4, 5 WPR - 7, 6
@EduHubSpot
@EduHubSpot 10 ай бұрын
1. Number of defects found - WPD 4. Number of change request completed - WPD Gautham
@sajidforever
@sajidforever 8 ай бұрын
1,2,4 - WPD - raw data obtained without comparison 3,5 - WPI - status after comparison with Planned vs Actual 6,7 - WPR - keyword are reports and dashboard
@EduHubSpot
@EduHubSpot 7 ай бұрын
Very impressive!! Gautham
@DeyDiscoveries
@DeyDiscoveries Жыл бұрын
Deliverable status -WPD
@EduHubSpot
@EduHubSpot Жыл бұрын
Correct Answer 3. Deliverable status - WPI Gautham
@Nagulsharifshaik-gh8te
@Nagulsharifshaik-gh8te Жыл бұрын
Number of defects found- work performance data as its execution level data. Finish dates of activities- WPD as it seems planning for the dates Deliverable status -WPD planned Number of change request completed- WPD its in execution Implementation status of change request.-wpr showing the status Status reports representing implementation status of change request- WPI showing the completion. Electronic dashboard representing deliverable status- wpr showing the dashboard.
@EduHubSpot
@EduHubSpot Жыл бұрын
3. Deliverable status - WPI 5. Implementation status of change request - WPI 6. Status reports representing implementation status of change request - WPR 7. Electronic dashboard representing deliverable status - WPR Gautham
@naveenlakkimsetti2759
@naveenlakkimsetti2759 Жыл бұрын
Number of defects found. - WPD, Reason- As per the keyword of WPD collecting the defects in this case Finish dates of activities - WPD, Reason - It is also part of collecting the raw data Deliverable status. - WPI, Reason - To know the status of the deliverable we need to compare with actual vs planned Number of change request completed. - WPD, Reason - It will not give the status of CR, here we are just collecting the no . of CR completed Implementation status of change request. - WPI, Reason - Status of the CR status can get from Planned vs Actual Status reports representing implementation status of change request. - WPR, Reason-Representation of data Electronic dashboard representing deliverable status. - WPR, Reason - Representation of data
@EduHubSpot
@EduHubSpot Жыл бұрын
That is exactly how you should think. Gautham
@yashtambe4263
@yashtambe4263 9 ай бұрын
 Number of defects found. - WFD - its a actual data  Finish dates of activities - Its and WFD.. its a Actual finished data  Deliverable status. - Its WFI - Status of the project that is comparison of plan and actual  Number of change requests completed. - WFD - its a actual data  Implementation status of change request. - WFI - Its a comparison of total change request and actual completed CRs  Status reports representing the implementation status of change request. - WFR  Electronic dashboard representing deliverable status. - WFR --- Its presentation of WFD
@EduHubSpot
@EduHubSpot 9 ай бұрын
Very impressive!! Gautham
@DeyDiscoveries
@DeyDiscoveries Жыл бұрын
Last two are WPR
@EduHubSpot
@EduHubSpot Жыл бұрын
Awesome job!! Gautham
@Vimal-Purbia
@Vimal-Purbia 2 ай бұрын
 Number of defects found. - WPD - Because its raw data which tell that number of defects found but doesn't tell its current status  Finish dates of activities - WPD - Its planning that has been done for each activities  Deliverable status. - WPI - It gives the information of actual deliverable status of the work  Number of change request completed. - WPI - It gives the status of no. of change requested completed  Implementation status of change request. - WPI - Prividing the information of change request, how it got implemented  Status reports representing implementation status of change request. - WPR - It is the report generated to show the status of CR, how it got implemented  Electronic dashboard representing deliverable status. - WPR - Again, its electronic dashboard which is example of WPR Please correct me if I am wrong.
@EduHubSpot
@EduHubSpot 2 ай бұрын
4. Number of change request completed - WPD Gautham
@pavanrudraraju7048
@pavanrudraraju7048 Ай бұрын
Very informative. Great explanation! Thank you
@EduHubSpot
@EduHubSpot Ай бұрын
Glad you enjoyed it! Gautham
@DeyDiscoveries
@DeyDiscoveries Жыл бұрын
Number of defeats found-WPD. Raw data
@EduHubSpot
@EduHubSpot Жыл бұрын
Great job!! Gautham
@muzawarm
@muzawarm Жыл бұрын
WP Data 1 = No of defects found , WP data 2 = Finish Date activities, WP data 3 = No of change requests ( identified defects requested for rework) --- This is all WP data as it is giving us info about project activities , defects found tells us from list of activities few were defected and not completed or delivered successfully, No of change request tells us that identified defects are requested for rework...... this overall is collecting data and actual progress of project activities,,, NOW Work Perf Info = WP info 1 = Project is out of schedule as few activities were not successfully delviered and have defects i.e No of defects in , WP info 2 = Change request for no of defects identified. as these 2 WP info's are derived by comparing the data with actual progress, Now reports are WP report 1 = deliverable status i.e out of list of activities planned e.g 10 activities 4 were defects & WP report 2 = change request for 4 defects implementation status of rework if all 4 were reowrked successfully or not.
@EduHubSpot
@EduHubSpot Жыл бұрын
Correct Answers : 3. Deliverable status - WPI 4. Number of change request completed - WPD 5. Implementation status of change request - WPI 6. Status reports representing implementation status of change request - WPR 7. Electronic dashboard representing deliverable status - WPR Gautham
@vengateshbabuvijayakannan9229
@vengateshbabuvijayakannan9229 Ай бұрын
Work Performance Data : Number of defects found, --> Collecting Actual Progress finish dates of activities --> Collecting Actual Progress No. of change request completed --> Collecting Actual Progress Work Performance Information - Deliverable Status --> Comparing Plan and Actual Progress Implementation status of change request --> Comparing Plan and Actual Progress Work Performance Report : Status reports representing implementation status of change request. --> An Electronic Representation of Work Performance Information Electronic dashboard representing deliverable status.--> An Electronic Representation of Work Performance Information
@EduHubSpot
@EduHubSpot Ай бұрын
Loving your thought process. Gautham
@user-dq8ge3fc7w
@user-dq8ge3fc7w Жыл бұрын
1 2 4 WORK PERFORMANCE DATA (these are actual and planned data) 3 5 WORK PERFORMANCE INFORMATION (these are status) 6 7 WORK PERFORMANCE REPORT (these are electrocic presentations)
@EduHubSpot
@EduHubSpot Жыл бұрын
Awesome job!! Gautham
@umamaheswariannadurai8462
@umamaheswariannadurai8462 2 ай бұрын
1) WPD: It is raw data 2) WPD: It is raw data 3) WPI: Information derived from data 4) WPD: It is raw data 5) WPI: Information derived from data 6) WPR: Report presented using Info 7) WPR: Report presented using Info
@EduHubSpot
@EduHubSpot 2 ай бұрын
Very impressive!! Gautham
@elgyalex6811
@elgyalex6811 5 ай бұрын
Number of defects found - WPD Finish dates of activities - WPD Deliverable status- WPI Number of change request completed- WPD Implementation status of change request - WPI
@EduHubSpot
@EduHubSpot 5 ай бұрын
Awesome Job !! Gautham
@mananjain1505
@mananjain1505 11 ай бұрын
1) Number of defects found- WPI 2) Finish date of activities- WPD Deliverable status- WPI 3) Number of change request completed- WPI 4) Implementation status of change request - WPI 5) Status report representation implementation status of change request - WPR;
@EduHubSpot
@EduHubSpot 11 ай бұрын
Correct Answers : 1. Number of defects found - WPD 2. Finish dates of activities - WPD 3. Deliverable status - WPI 4. Number of change request completed - WPD 5. Implementation status of change request - WPI 6. Status reports representing implementation status of change request - WPR 7. Electronic dashboard representing deliverable status - WPR Gautham
@shaleenm2k
@shaleenm2k Жыл бұрын
Number of defects found work performance data Finish dates of activities work performance data Deliverable status work performance information Number of change request completed. work performance data Implementation status of change request. work performance information Status reports representing implementation status of change request. work performance report Electronic dashboard representing deliverable status. work performance report
@EduHubSpot
@EduHubSpot Жыл бұрын
Very impressive!! Gautham
@SujataManish-yr7bo
@SujataManish-yr7bo 2 ай бұрын
" Number of defects found. WPD  Finish dates of activities WPD  Deliverable status. WPI  Number of change request completed. WPD  Implementation status of change request. WPI  Status reports representing implementation status of change request. WPI  Electronic dashboard representing deliverable status. WPR
@EduHubSpot
@EduHubSpot Ай бұрын
Loving your thought process. Gautham
@narawseedagaj
@narawseedagaj Жыл бұрын
Implementation status of change request - WPI , comparing with Plan on number of change request implemented so far
@EduHubSpot
@EduHubSpot Жыл бұрын
Very impressive!! Gautham
Iron Chin ✅ Isaih made this look too easy
00:13
Power Slap
Рет қаралды 33 МЛН
HUGE NEW UPDATES to the PMP Prep Course by David McLachlan
5:21
David McLachlan
Рет қаралды 7 М.
MBTI Explained for PMP exam 2024
16:39
EduHubSpot
Рет қаралды 8 М.
PMP 2024 using PMP Exam Outline and not PMBOK 7th Edition
12:16
EduHubSpot
Рет қаралды 31 М.