Рет қаралды 208,342
The house sank about 5" because it was build on sand. The footing was only 10" deep. Once we raised it a few inches we realized the sill plates were also rotten. We separated the house from the foundation by knocking out cinder blocks and lifting it with bottle jacks. We then replaced the sill plates and leveled it. 6 days total and about $1000.00 in material.